FDNY B-03 Testing of In-Building Auxiliary Radio Communication Systems Practice Examination Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- What is the primary purpose of an Auxiliary Radio Communication
- Improve building Wi-Fi
- Provide reliable FDNY radio communication inside buildings
- Reduce cellular dead zones
- Support building automation
System (ARCS)?
Rationale: ARCS ensures FDNY radios work throughout a building during
emergencies.
- Which frequency band is used by FDNY ARCS systems?
A. VHF
B. UHF 1 / 4
- HF
- 5 GHz
Rationale: FDNY operates on UHF frequencies for in-building
communications.
- Who is authorized to perform ARCS acceptance testing?
- Any electrician
- Building owner
- FDNY-certified B-03 Certificate of Fitness holder
- Radio vendor only
Rationale: Only B-03 certified personnel may perform official ARCS testing.
- Which document defines ARCS performance requirements?
A. NFPA 13
- NYC Mechanical Code
- NYC Fire Code
- FDNY Rule 3RC
Rationale: ARCS requirements fall under the NYC Fire Code and related
FDNY rules.
- What minimum signal strength is required for ARCS coverage?
- −120 dBm
- −110 dBm
- −95 dBm
- −65 dBm 2 / 4
Rationale: FDNY requires −95 dBm or better for reliable radio
communication.
- How often must ARCS be inspected?
- Weekly
- Monthly
- Every 3 years
- Annually
Rationale: Annual testing ensures ongoing system reliability.
- What part of the building must achieve ARCS coverage?
- Public areas only
- Mechanical rooms only
- Above-grade spaces only
- The entire building, including critical areas
Rationale: ARCS must cover all areas, especially fire command and
emergency zones.
- What component receives FDNY radio transmissions?
- Bi-directional antenna
- Donor antenna
- Breaker panel
- Duplexer
Rationale: The donor antenna brings in external FDNY radio signals.
- What device amplifies both uplink and downlink signals? 3 / 4
- Patch panel
- Bi-Directional Amplifier (BDA)
- Combiner
- Metering panel
Rationale: BDAs amplify signals in both directions.
- What must be verified before ARCS testing?
- Cellular service
- HVAC system
- FDNY radio activity and spectrum conditions
- Elevator operation
Rationale: Proper radio environment must be confirmed for accurate ARCS
testing.
- Which test ensures signal passes through building materials?
- Voltage test
- Battery test
- RF coverage test
- Load test
Rationale: RF testing validates radio signal strength through structures.
- What backup power duration is required for ARCS?
- 15 minutes
- 24 hours
- 48 hours
- / 4