• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

FDNY E13 Underwater Blasting Exam

Class notes Jan 3, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

FDNY E13 Underwater Blasting Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • Which document grants legal authority to perform underwater
  • blasting in New York City waters?

  • State environmental waiver
  • Local business license
  • FDNY blasting permit
  • Harbormaster verbal approval

Rationale: Underwater blasting in NYC requires an FDNY blasting

permit issued after review of safety and regulatory compliance.

  • The primary purpose of a pre-blast survey for an underwater blast is

to:

  • Test explosives on site
  • Identify underwater hazards and nearby structures/occupants
  • Determine the weather for the day
  • Estimate the cost of operations 1 / 4

Rationale: A pre-blast survey documents nearby structures, marine

life, vessels, and seabed conditions to plan safety zones and mitigation.

  • Which professional is typically responsible for designing an
  • underwater blast plan?

  • Site foreman
  • Local dive shop owner
  • Qualified blasting engineer or licensed blaster with underwater
  • experience

  • Harbor patrol officer

Rationale: Blast plans require technical knowledge; a qualified

blasting engineer or licensed underwater blaster prepares the design and safety measures.

4. Before conducting underwater blasting, notification must be given to:

  • Only the hire company’s office
  • FDNY, local marine authorities, and nearby stakeholders
  • Random contractors in the area
  • Only the dive team

Rationale: Notifications ensure coordination with regulators,

maritime traffic control, and affected parties for safety and legal compliance.

  • What is a key environmental concern specific to underwater blasting?
  • Air contamination only 2 / 4
  • Soil erosion on land only
  • Marine life injury from shock waves and debris
  • Electromagnetic interference

Rationale: Underwater blasts generate pressure waves and debris

that can injure fish and marine mammals; mitigation and monitoring are required.

  • For underwater blasting, which piece of PPE is essential for surface
  • personnel handling charges (non-diving)?

  • Baseball cap
  • Flame-resistant clothing and hearing protection
  • Regular street clothes
  • Sandals

Rationale: Handling explosives requires flame-resistant clothing,

hearing protection, and other PPE to reduce injury risk.

  • When planning an underwater blast, which factor most affects
  • propagation of the pressure wave?

  • Color of explosives
  • Daylight hours
  • Water depth and seabed substrate
  • Latitude of the site

Rationale: Depth and substrate (mud, sand, rock) influence how

pressure waves travel and reflect, affecting safe standoff distances. 3 / 4

  • An exclusion zone for vessels during underwater blasting is established

primarily to:

  • Provide an audience for the operation
  • Increase project speed
  • Ensure public and vessel safety from shock waves and flying debris
  • Block fishing activities permanently

Rationale: Exclusion zones prevent vessels and personnel from

entering areas where blast effects could be hazardous.

  • Which tool is commonly used to determine precise charge placement
  • underwater (non-actionable level)?

  • Hammer and chisel only
  • Underwater survey instruments and dive positioning systems
  • Visual estimates from shore
  • Cellphone GPS alone

Rationale: Underwater surveys use positioning systems and diver

navigation to ensure correct charge placement per the blast plan.

10. Post-blast inspections should include:

  • Nothing — operations end after detonation
  • Only paperwork filing
  • Visual and sonar surveys for debris and unexploded ordnance
  • Immediate resumption of construction without checks
  • Rationale: Inspections verify fragmentation, debris removal needs,

  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

The comprehensive coverage offered by this document was incredibly useful for my research. A outstanding purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 3, 2026
Description:

FDNY E13 Underwater Blasting Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. Which document grants legal authority to perform under...

Unlock Now
$ 1.00