• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

FDOT Asphalt Paving Level 2 Exam

QUESTIONS & ANSWERS Dec 16, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

FDOT Asphalt Paving Level 2 Exam (Latest Update 2025 / 2026) Prep Questions & Answers | Grade A | 100% Correct

Question:

In project documents order, which Document(s) has higher authority than the Supplemental Specifications?

  • Standard Specifications
  • Plans
  • Technical Special Provisions
  • All of the above
  • Both B and C

Answer:

(E. Both B and C) Plans and Technical Special Provisions

  • / 3

Question:

What is the desired tack coat application rate for a milled surface?

  • 0.02-0.08 gal/yd²
  • 0.45 gal/yd²
  • 0.06 gal/yd²
  • 0.08 gal/yd²
  • All the above

Answer:

(C.) 0.06 gal/yd²

Question:

Density Testing for acceptance will not be performed on:

  • Shoulder less than 5 feet or less
  • Miscellaneous Asphalt Pavement
  • Cross-overs and intersections less than 1000 feet
  • Acceleration and deceleration lanes less than 1000 feet
  • All the above

Answer:

(E. All the Above) - Shoulder less than 5 feet or less, Miscellaneous Asphalt Pavement, Cross-overs and intersections less than 1000 feet, and Acceleration and deceleration lanes less than 1000 feet 2 / 3

Question:

A _______ is utilized when attempting to match elevations of two mats placed side by side

Answer:

(D.) Joint Matcher

Question:

Experts maintain that 95% of paver related problems can be eliminated by:

  • Keeping the hopper empty between loads
  • Keeping the paver running slow
  • Adjusting the tow points constantly
  • Maintaining a uniform head of material in front of the auger
  • All the above

Answer:

(D.) Maintaining a uniform head of material in front of the auger

Question:

When milling for slope on the mainline roadway, if the average of 10 slope checks for the VT differs from the target by 0.1% what is required?

Answer:

(A.) Tell Contractor to shut down milling operation. Make corrections

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its detailed explanations, this document helped me ace my presentation. Definitely a outstanding choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: QUESTIONS & ANSWERS
Added: Dec 16, 2025
Description:

FDOT Asphalt Paving Level 2 Exam (Latest Update) Prep Questions & Answers | Grade A | 100% Correct Question: In project documents order, which Document(s) has higher authority than the Supplemental...

Unlock Now
$ 1.00