• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

ICC U2 UST DECOMMISSIONING EXAM ACTUAL

Exam (elaborations) Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

ICC U2 UST DECOMMISSIONING EXAM (ACTUAL / )

QUESTIONS AND VERIFIED ANSWERS (GRADED A+)

Which monitoring requirement applies to all (suction, gravity, emergency generator) double wall piping?

  • All secondary containment, including under-dispenser
  • containment, shall be equipped with a continuous monitoring system that either activates an audible and visual alarm or stops the flow of product at the dispenser when it detects a leak.

  • After November 9, 2004 automatic line leak detectors shall
  • be installed on underground piping.

  • A 0.1 gph annual pipe integrity test must be conducted.
  • Positive pump shut-down and fail safe must be installed on
  • all leak detection devices. - ---Answers----a. All secondary containment, including under-dispenser containment, shall be equipped with a continuous monitoring system that either activates an audible and visual alarm or stops the flow of product at the dispenser when it detects a leak.

CCR; 2636 (f)(1)

  • / 4

Additional pressurized piping monitoring options become effective November 9, 2004. Which of the following will not be a monitoring requirement for non-emergency generator, double wall, pressurized product piping after November 9, 2004?

  • Continuous monitoring system that either activates an
  • audible and visual alarm or stops the flow of product at the dispenser when it detects a leak for all secondary containment, including under-dispenser containment.

  • A 3.0-gph automatic line leak detector must be installed.
  • An annual 0.1 piping test or positive pump shut-down and
  • fail safe for all secondary containment, except for the UDC monitoring.

  • An annual 0.1 piping test or a monthly 0.2 gph pipe must be
  • conducted. - ---Answers----d. An annual 0.1 piping test or a monthly 0.2 gph pipe must be conducted.

CCR; 2626 (f) (monthly 0.2 gph is not authorized)

An additional pressurized piping monitoring requirement becomes effective November 9, 2004. Which of the following will not be a monitoring requirement for double wall, pressurized product piping for USTs that supply emergency generators after November 9, 2004?

  • Continuous monitoring system that either activates an
  • audible and visual alarm or stops the flow of product at the 2 / 4

dispenser when it detects a leak for all secondary containment, including under-dispenser containment.

  • A 3.0-gph automatic line leak detector must be installed or
  • daily visual or electronic inspections of the monitoring system must conducted and logged.

  • An annual 0.1 piping test or positive pump shut-down and
  • fail safe for all secondary containment, except for the UDC monitoring.

  • An annual 0.1 piping test or a monthly 0.2 gph pipe must be
  • conducted. - ---Answers----d. An annual 0.1 piping test or a monthly 0.2 gph pipe must be conducted.

CCR; 2636 (f)

All of the following are true regarding enhance leak detection

(ELD), EXCEPT?

  • UST systems with single wall components within 1000 feet
  • of a public drinking water well must conduct ELD and repeat ELD every 36 months.

  • Double wall UST systems within 1000 feet of a public
  • drinking water well must conduct ELD.

  • USTs installed after July 1, 2003 undergo ELD or a 3rd party
  • approved inert gas test method.

  • There are several different types of 3rd party approved ELD.
  • ---Answers----d. There are several different types of 3rd
  • party approved ELD.

  • / 4

CCR; 2640(e), 2644.1 and H≻ 25292.4, 25292.5, 25290.2(i), and 25290.1 (j)

All of the following are true regarding enhance leak detection

(ELD), EXCEPT?

  • UST owners/operators that are required to implement a ELD
  • program must submit the program to the local agency for approval within 6 months of notification.

  • UST owners/operators that are required to implement a ELD
  • program must implement the program within 18 months of notification.

  • UST owners/operator must notify the local agency 48 hours
  • prior to ELD testing and submit a copy of the test results with 60 days.

  • Secondary containment testing of emergency generator
  • systems using ELD are exempt from notification requirements.

  • ---Answers----d. Secondary containment testing of
  • emergency generator systems using ELD are exempt from notification requirements.

CCR; 2644.1 and H&SC 25284.1(a)(4)(B)(ii)

What is the correct definition of an UST?

  • Any one or combination of tanks, including pipes connected
  • thereto, that is used for the storage of hazardous substances

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document provided in-depth analysis, which enhanced my understanding. Absolutely superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 15, 2025
Description:

ICC U2 UST DECOMMISSIONING EXAM (ACTUAL / ) QUESTIONS AND VERIFIED ANSWERS (GRADED A+) Which monitoring requirement applies to all (suction, gravity, emergency generator) double wall piping? a. All...