IFSTA DRIVER/OPERATOR STUDY
GUIDE QUESTIONS WITH ALL
CORRECT ANSWERS VERIFIED .
⫸ If the IC initiates a operations section, who does the water supply
Supervisor report to? Answer: Operations section chief Ch. 14 Pg. 429
⫸ What is the typical radio designation for the water supply supervisor?
Answer: Water Supply Ch. 14 Pg. 430
⫸ The water supply supervisor should assign individuals to be in charge of
the fill site and dump site who's call signs should be what? Answer: "fill
site" "dump site" Ch. 14 Pg. 430
⫸ If the IC establishes a water supply branch, what is the title for the
person in charge of the area? Answer: Water Supply Branch Director Ch. 14
Pg. 430
⫸ What is the purpose of the fill site operation? Answer: To reload empty
tenders as expediently as possible. Ch. 14 Pg. 430
⫸ The ideal fill sight is the one that allows driver/operators to do what?
Answer: Enter and exit the fill site without backing up or turning around.
Ch. 14 Pg. 432
- / 2
⫸ Each hoseline that is used to fill tenders in water shuttle operations
should have a gate valve where? Answer: Between the last and next to last
section of hose. Ch. 14 Pg. 433
⫸ In-line water siphons should be pumped at ___psi and provide ___-___gpm
through 4" pipe. Answer: 150psi; 700-800gpm Ch. 14 Pg. 434
⫸ The firefighters that are assigned to handle the tender fill lines are
referred to as what? Answer: Make and Break Personnel Ch. 14 Pg. 434
⫸ What are the three primary methods that can be used to operate a dump
site? Answer: - Direct pumping operations
- Nurse tender operations
- Portable water tank operations
Ch. 14 Pg. 436-437
⫸ This method is typically set up by having the attack pumper lay out a supply line, equipped with a clapper or gated siamese, to a location that is
easily accessible to tenders approaching the scene. Answer: Direct pumping
operations Ch. 14 Pg. 436
⫸ This method generally involves a very large water tender that is positioned immediately adjacent to the attack pumper and fulfills the same
function as a portable tank. Answer: Nurse Tender Operations Ch. 14 Pg.
436
⫸ What three ways can water be unloaded from a tender at the dump site?
Answer: - Using a pump on the tender
- Using a dump valve
- Pumping and dumping simultaneously
- / 2
Ch. 14 Pg. 437