How long must lead abatement last? - ANSWER- 20 Years
When diagraming a house for a Risk assessment, the "A" side is the? - ANSWER- Address Size
What is the purpose of lead inspections? - ANSWER- Identify LBP
What year was LBP banned for residential use properties? -
ANSWER- 1978
What are the two categories of lead hazards in a risk assessment? - ANSWER- Material hazard and surface hazard
What conditions are necessary to have a friction surface hazard?
- ANSWER- LBP, evidence of abrasion, and dust on nearby
horizontal surfaces. 1 / 4
- | P a g e
What conditions are necessary to have a impact surface hazard?
- ANSWER- LBP, in contact with another building component,
and evidence of damage.
What exterior soil areas need to be tested? - ANSWER- Where
bare soil is present:
- Dripline of house
- Play areas and vegetable gardens
- Areas greater than 9 sq. ft.
What Federal document serves as an overall guideline for performing inspections, risk assessments, and abatement activities? - ANSWER- Hud Guidelines
A child may be treated for lead poisoning by using... - ANSWER- Chelation Therapy
How does lead primarily enter children's bodies? - ANSWER- Ingestion
Which is more useful for the renovation contractor, the lead inspection or the risk assessment? - ANSWER- Lead Inspection 2 / 4
- | P a g e
What six sampling methods do Risk Assessors use to identify lead hazards? - ANSWER- Visual Dust Soil Paint Chip XRF Water
What are the six LBP hazards defined by EPA? - ANSWER- Dust Friction Surface Impact Surface Chewable Surface Deteriorated Paint Soil
Where would you find operational data for an XRF? - ANSWER- Performance Characteristic Sheet (PCS)
How many dust samples are usually taken for a Risk Assessment? - ANSWER- 13 3 / 4
- | P a g e
What are the three forms of lead abatement? - ANSWER- Removal Enclosure Encapsulation
How often do you calibrate an XRF? - ANSWER- Beginning End Every 4 hours Every time the device is powered down
Target Housing - ANSWER- Any houses built before 1978
except:
Housing designated for elderly Designated housing for disabled adults Zero bedroom units (except for children under age 6) Vacant houses awaiting demolition
Lead-Safe Work Practices - ANSWER- 1. Minimize or eliminate generation of dust/debris
- Contain dust/debris in regulated work area
- Collect debris on disposable sheeting