CA C32 Parking And Highway Improvement Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf
- What is the primary purpose of a Traffic Control Plan (TCP) in
- To reduce construction costs
- To improve aesthetics of the work zone
- To ensure the safety of workers and road users
- To increase traffic speed
highway construction?
Rationale: A TCP is required to maintain safety for both workers and
the traveling public by managing traffic flow and minimizing risks.
- Which agency typically approves Traffic Control Plans for state
- Caltrans
- Local Department of Transportation (DOT)
highways in California?
C. OSHA
D. EPA
Rationale: The local DOT or Caltrans approves TCPs to ensure
compliance with state and federal standards.
- What is the standard maximum slope for highway ramps according to
- 4%
- 6%
- 8%
California highway design standards?
D. 10%
Rationale: Highway ramps are typically limited to a maximum 6%
slope to maintain safe vehicle operation. 1 / 3
- When constructing a parking lot, what is the minimum thickness of
- 2 inches
- 3 inches
- 4 inches
- 6 inches
asphalt for standard passenger vehicles?
Rationale: A 4-inch asphalt thickness is standard for parking areas
accommodating passenger vehicles, providing sufficient durability.
- Which test is commonly used to determine the compaction of subgrade
- Tensile test
- Shear test
- Proctor test
- Slump test
soil?
Rationale: The Proctor test measures soil compaction characteristics
to ensure adequate load-bearing capacity.
- What is the minimum width of a standard traffic lane on a California
- 9 feet
- 12 feet
- 14 feet
- 10 feet
highway?
Rationale: Standard lane widths are 12 feet to accommodate vehicles
safely at highway speeds.
- Which material is most commonly used for base course in highway
- Sand
- Clay
- Crushed aggregate
- Asphalt emulsion
construction?
Rationale: Crushed aggregate provides a stable, durable base for
pavement construction.
- What is the main environmental concern when installing asphalt
- Traffic congestion
- Air emissions from asphalt plants
- Worker productivity 2 / 3
pavements?
- Pavement color
Rationale: Asphalt production can release volatile organic
compounds (VOCs) and other pollutants, making air emissions a primary concern.
- When resurfacing a highway, what is the recommended milling depth
- 0.5 inches
- 1 inch
- 2 inches
- 4 inches
for asphalt overlays?
Rationale: Milling 2 inches of the existing pavement ensures proper
bonding of the new overlay and addresses surface defects.
- Which device is used to slow down traffic in a temporary
- Warning signs
- Cones
- Speed reduction signs
- Pavement markings
construction zone?
Rationale: Speed reduction signs are used to notify drivers to slow
down and maintain safety within work zones.
- What is the typical curing period for concrete before allowing
- 12 hours
- 24 hours
- 7 days
- 28 days
traffic on a new pavement?
Rationale: Concrete generally requires at least 7 days to reach
adequate strength for light traffic, though full design strength is reached at 28 days.
- Which of the following is a standard method for asphalt
- Brushing
- Rolling with a steel-wheel roller
- Hand tamping
- Screeding
compaction?
Rationale: Steel-wheel rollers are commonly used to achieve uniform
asphalt compaction.
- / 3