• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep
Please log in to purchase this document.

Integrated Approach 8e

Testbanks Dec 29, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Operations Management An Integrated Approach 8e Dan Reid, Nada Sanders (Solutions Manual All Chapters, 100% Original Verified, A+ Grade) All Chapters/Supplement files download link at the end of this file. 1 / 4

Reid & Sanders Operations Management, 8th Edition Solutions Manual © 2023 John Wiley & Sons, Inc.All rights reserved. SM 2-1 Solutions Manual

Chapter 2: Operations Strategy and Competitiveness

1.Two workers have the job of placing plastic labels on packages before the packages are shipped out. The first worker can place 1,000 labels in 30 minutes.The second worker can place 850 labels in 20 minutes. Which worker is more productive?

Answer:

Productivity of worker 1 = 1000 labels/30 minutes = 33.3 labels per minute Productivity of worker 2 = 850 labels/20 minutes = 42.5 labels per minute Worker 2 is more productive.

Section: Productivity

Subsection: Interpreting Productivity Measures

LO: 2.5 Define productivity and identify productivity measures.

Bloom’s: Application

AACSB: Analytic

Time on task: 2 minutes 2 / 4

Reid & Sanders Operations Management, 8th Edition Solutions Manual © 2023 John Wiley & Sons, Inc. All rights reserved. SM 2-2

  • Last week a painter painted four houses in three days. This week she painted six
  • houses in four days. In which week was the painter more productive?

Answer:

Productivity in worker 1 = 4 houses / 3 days = 1.33 houses per day

Productivity in worker 2 = 6 houses / 4 days = 1.5 houses per day

The painter was more productive in week 2.

Section: Productivity

Subsection: Interpreting Productivity Measures

LO: 2.5 Define productivity and identify productivity measures.

Bloom’s: Application

AACSB: Analytic

Time on task: 2 minutes

  • / 4

Reid & Sanders Operations Management, 8th Edition Solutions Manual © 2023 John Wiley & Sons, Inc. All rights reserved. SM 2-3

  • One type of bread-making machine can make six loaves of bread in five hours. A
  • new model of the machine can make four loaves in two hours. Which model is more productive?

Answer:

Productivity of old model machine = 6 loaves / 5 hours = 1.2 loaves per hour

Productivity of new model machine = 4 loaves / 2 hours = 2.0 loaves per hour

The new model is more productive.

Section: Productivity

Subsection: Interpreting Productivity Measures

LO: 2.5 Define productivity and identify productivity measures.

Bloom’s: Application

AACSB: Analytic

Time on task: 2 minutes

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its step-by-step guides, this document made learning easy. Definitely a impressive choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Testbanks
Added: Dec 29, 2025
Description:

Operations Management An Integrated Approach 8e Dan Reid, Nada Sanders (Solutions Manual All Chapters, 100% Original Verified, A+ Grade) All Chapters/Supplement files download link at the end of th...

Unlock Now
$ 1.00