• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

LATEST - CORE PREP TEST

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

LATEST - CORE PREP TEST

What is the purpose of installing an auxiliary boom point sheave to the main boom tip?: Separate hoist lines

A designated Lift Director shall be assigned by the ?: Site Supervisor

Who is responsible for calculating net capacity?: Crane Operator

Who is responsible for ensuring all rigging is supervised by a Qualified Rigger?: Site Supervisor/ Lift Director Who is responsible for ensuring the crane owner is notified of any damage to the crane

or replacement/repair of wire rope?: Crane User

Who is responsible for restricting unauthorized access to the crane's work area?: Site Supervisor/Lift Director Who is responsible for ensuring crane operations are stopped if alerted to an unsafe

condition?: Lift Director

If the operator or A/D determine that ground conditions are not suitable for the equipment being operated, they should request the correct the issue: Controlling Entity Who is responsible for ensuring that personnel involved in crane operations understand their responsibilities, assigned duties and associated hazards?: - Lift Director When can the operator of a crane set the crane up with less than fully extended

outriggers?: When the load chart allows

The outrigger pad and cribbing should be strong enough to support?: The total weight of the crane and the load What must be known prior to setting up your crane?: Location of under- ground vaults What is the minimum distance the flange on the hoist drum should extend above the

last wrap of rope?: ½ inch

Eccentric main boom tip reeving will: Twisting of the boom 1 / 2

LATEST - CORE PREP TEST

What is the most common wire rope used on most cranes?: Right regular lay

Prior to leveling a crane what should be done with the outrigger jack?: Se- cure the float pad to jack cylinder What three functions will not work after two-blocking a crane that has a prevention

system?: Boom down, extend the boom and hoist

Boom angle on a telescoping boom is measured from above or below horizontal to the

?: Longitudinal axis of the boom base section

The line pull of the innermost layer on the hoist drum is than the outermost layer.: Greater

Side loading of a crane can be caused by?: Wind

If power fails to the crane what must the operator ensure is done?: The controls are put in the neutral position

On a multiple crane lift, do not exceed of the load chart.: 75%

If a crane operator knows the boom length and the boom angle he could use the range

diagram to estimate what ?: Load radius

Which of the following jib offsets will have the least amount of capacity?-

: 30 degrees

When is it okay to make modifications to the structure of the crane's upper works?: With written permission from the manufacturer

A sudden stop of the hoist on a crane will produce a what?: Dynamic load

When hoisting personnel from a crane, what must be on the crane?: -

Anti-two block device

What grade of alloy steel chain should be used for hoisting slings?: 80

Each time a line passes from the boom point to the load block it is considered a ?: Part

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its practical examples, this document helped me ace my presentation. Definitely a impressive choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

LATEST - CORE PREP TEST What is the purpose of installing an auxiliary boom point sheave to the main boom tip?: Separate hoist lines A designated Lift Director shall be assigned by the ?: Site Supe...

Unlock Now
$ 1.00