D 196 / D196 Pre - Assessment (Latest Update 2025/ 2026) Principles of Financial and Managerial Accounting | Questions & Answers | Grade A | 100% Correct - WGU
Question:
In an ABC system, which name is given to a numerical measure reflecting the amount of a cost associated with a particular overhead cost activity?
- Cost system
- You Selected
- Cost pool
- Cost metric
- Cost driver
Answer:
Cost driver
- / 4
Question:
How are production costs treated in a process costing system?
- Costs are assigned to the actual manufacturing overhead account during
- Costs are assigned to specific jobs or products made during the period.
- Costs are accumulated by process and averaged over all products made
- Costs are assigned to a selling, general, and administrative expense account
the period.
during the period.
during the period.
Answer:
Costs are accumulated by process and averaged over all products made during the period.
Question:
How is the production cost per unit computed in a process costing system?
- Amount of overhead cost divided by the number of units completed
- Amount of direct materials cost divided by the quantity of direct materials
- Amount of total production cost divided by the number of units
- Amount of direct labor cost divided by the number of direct labor hours
during a particular period of time
used during a particular period of time
completed during a particular period of time
used during a particular period of time
Answer:
Amount of total production cost divided by the number of units completed during a particular period of time 2 / 4
Question:
For which production process is process costing the appropriate costing method to use?
- Refining gasoline in a petroleum facility
- Producing made-to-order industrial equipment
- Building custom-made furniture
- Constructing a high-rise office building
Answer:
Refining gasoline in a petroleum facility
Question:
Which overhead allocation method should be used for a business that mass- produces breakfast cereal?
- Job order costing
- Product-line costing
- Process costing
- ABC costing
Answer:
Process costing
- / 4
Question:
What is the correct sequence for the flow of costs through a job order costing system?
- Raw materials inventory, work-in-process inventory, cost of goods sold,
- Raw materials inventory, cost of goods sold, work-in-process inventory,
- Raw materials inventory, work-in-process inventory, finished goods
- Raw materials inventory, finished goods inventory, cost of goods sold,
finished goods inventory
finished goods inventory
inventory, cost of goods sold
work-in-process inventory
Answer:
Raw materials inventory, work-in-process inventory, finished goods inventory, cost of goods sold
Question:
Which type of company cannot use job order costing?
- Building construction
- Tax accountant for wealthy people
- Road construction
- Petroleum refining plant
Answer:
Petroleum refining plant
- / 4