• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep
Please log in to purchase this document.

Latest Update Quality,

QUESTIONS & ANSWERS Dec 16, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

D469 / D 469 Pre - Assessment (Latest Update 2025 / 2026) Quality, Continuous Improvement and Lean Six Sigma | Questions and Answers | 100% Correct | Grade A - WGU

Question:

A chemical plant manager is not satisfied with a production process and requests input from plant employees about methods that can be used to make improvements.

Which lean process is the manager using?

Answer:

Kaizen

  • / 3

Question:

A company is utilizing Six Sigma concepts to streamline its widget production.

What is the primary reason the company is using this strategy?

Answer:

To reduce variability

Question:

An electric car company is deciding whether it should utilize a lean production strategy.

Which characteristic suggests the company would benefit from a lean strategy?

Answer:

There is a low variability of demand

  • / 3

Question:

A shipping container company wants to use a kanban system to reduce inventory levels. The formula for the number of kanbans is given as N = ( d L + S ) C .

N = number of kanbans d = average demand per unit of time L = lead time S = safety stock C = container size

What happens to the number of kanbans (N) when the container size (C) is doubled, and other parameters are kept constant?

Answer:

Halves

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document provided comprehensive coverage, which enhanced my understanding. Absolutely impressive!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: QUESTIONS & ANSWERS
Added: Dec 16, 2025
Description:

D469 / D 469 Pre - Assessment (Latest Update) Quality, Continuous Improvement and Lean Six Sigma | Questions and Answers | 100% Correct | Grade A - WGU Question: A chemical plant manager is not sat...

Unlock Now
$ 1.00