• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

LATEST VERSION - Questions with Correct Detailed Answers || Alre...

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO Mobile Crane Exam ( / ) Questions with Correct Detailed Answers || Already Graded A+

  • Under which circumstance is a crack in the windshield of a crane cab okay?
  • As long as it causes no visible distortion that would interfere with safe
  • operations

  • As long as it is less than 6 inches long
  • As long as the windshield is replaced on the next annual inspection d.
  • It is never okay - ANSWER ✔ a.

  • Under which circumstance does OSHA permits hoisting of personnel by
  • crane?

  • As long as the prevailing wind speed is less than 35 mph
  • As long as there is no less hazardous or practicable way
  • As long as all personnel have CPR training
  • As long as no aerial work platform is available - ANSWER ✔ b.
  • Unless the manufacturer states otherwise, what crane capacity chart is
  • appropriate when a crane is set up with 3 of its 4 outriggers extended and the fourth is retracted?

  • On-outrigger chart
  • On-rubber chart
  • On-outrigger chart minus 20%
  • On-rubber chart plus 20% - ANSWER ✔ b.
  • / 3
  • According to OSHA, while hoisting personnel, the total load must not
  • exceed what percentage of the crane's rated capacity?"

  • 45%
  • 50%
  • 75%
  • 85% - ANSWER ✔ b.
  • When is side loading of crane booms permitted?
  • When the operator says it's OK
  • So long as no jib is installed
  • Only when the outriggers are fully extended
  • Only with freely suspended loads - ANSWER ✔ d.
  • What is indicated if an operator makes two audible signals when moving a
  • crane?

  • He/she intends to stop
  • He/she intends to back up
  • He/she intends to go ahead
  • He/she intends to stop (emergency) - ANSWER ✔ c.
  • When may blocking (cribbing) be placed under outrigger beams?
  • When beams cannot be extended all the way out
  • To increase capacity
  • To improve stability
  • Never - ANSWER ✔ d.
  • Upon completion of assembly of the crane, what must be done? - ANSWER
  • ✔ An inspection to ensure that manufacturer specifications are met

  • During crane assembly, the counter weight should be installed when? -
  • ANSWER ✔ Before raising the boom

  • / 3
  • A long boom crane at a short radius and out of level by 300 can see a

reduction incapacity by as much as: - ANSWER ✔ 50%

  • Crane stability is based on - ANSWER ✔ lever principle
  • What is the OSHA standard for cranes in construction industry? - ANSWER
  • ✔ 29 CFR-1926. Subpart CC

  • What are the requirements to be a crane inspector? - ANSWER ✔ Same as
  • operator

  • What percentage of the crane chart is considered a critical lift? - ANSWER

✔ 75%

  • A multi crane lift shall require - ANSWER ✔ Critical lift plan, reduction of
  • gross capacity by 25% and one designated person in charge.

  • When doing a pick and carry, tire pressure must - ANSWER ✔ meet
  • manufacturer's specifications

17. The load chart is matched to the crane by: - ANSWER ✔ Serial number

  • Where do you find recommended reeving for the hoist lines? - ANSWER ✔
  • Owner's manual

  • What is the result of placing timber blocking under the tips of the tracks on a
  • crawler crane?

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the in-depth analysis in this document. It made learning easy. Truly superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO Mobile Crane Exam ( / ) Questions with Correct Detailed Answers || Already Graded A+ 1. Under which circumstance is a crack in the windshield of a crane cab okay? a. As long ...

Unlock Now
$ 1.00