• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Level 2 Certification Practice Exam

Class notes Jan 1, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Residential Construction Superintendent Level 2 Certification Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • Which document primarily defines the scope of work for each
  • subcontractor?

  • Project schedule
  • Purchase order
  • Subcontract agreement
  • Daily log

Rationale: The subcontract agreement lists the exact tasks, materials, and

responsibilities assigned to each subcontractor.

  • When excavating near an existing foundation, what is the most important
  • safety consideration?

  • Noise control 1 / 4
  • Equipment emissions
  • Worker rotation
  • Soil stability

Rationale: Soil stability prevents trench or wall collapse, which is the

leading hazard near foundations.

  • What is the first step before pouring a concrete foundation?
  • Install form boards
  • Compact soil
  • Place rebar
  • Verify footing inspection approval

Rationale: Concrete cannot be poured until the inspector verifies footing

compliance with code and plans.

  • Which schedule format best tracks progress across multiple trades?
  • Bar chart
  • Critical path method (CPM)
  • Punch list
  • Cost report

Rationale: CPM identifies task dependencies and the minimum project

duration, suitable for complex builds.

  • A superintendent notices the plumbing rough-in deviates from plans.
  • What is the proper first action?

  • Notify the client
  • Stop work and contact the project manager 2 / 4
  • Record in daily log only
  • Continue until inspection

Rationale: The superintendent must halt incorrect work to avoid rework

and coordinate correction through management.

  • Which OSHA standard regulates fall protection in residential
  • construction?

A. 1926.300

B. 1926.501

C. 1910.120

D. 1926.403

Rationale: OSHA 1926.501 outlines requirements for fall protection during

residential framing and roofing.

7. The purpose of a punch list is to:

  • Schedule inspections
  • Identify incomplete or defective work before final acceptance
  • Document weather delays
  • Estimate costs

Rationale: Punch lists itemize final corrections required before project

closeout.

  • What determines the allowable spacing for framing members?
  • Paint schedule
  • Concrete strength
  • Load and span 3 / 4
  • Fastener type

Rationale: Spacing depends on design load and the span between supports

per building code.

  • When preparing for a city inspection, who ensures compliance of all
  • installed systems?

  • Architect
  • Owner
  • Superintendent
  • Code official

Rationale: The superintendent coordinates subcontractors and verifies

readiness before the inspector arrives.

  • Which type of insulation is most effective for irregular cavities?
  • Rigid foam
  • Batt
  • Spray foam
  • Reflective foil

Rationale: Spray foam expands to fill voids, providing superior air sealing

and coverage.

11. A “change order” is issued to:

  • Record inspection
  • Modify contract scope, cost, or schedule
  • Approve material delivery
  • Update safety plan
  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

With its step-by-step guides, this document helped me ace my presentation. Definitely a superb choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 1, 2026
Description:

Residential Construction Superintendent Level 2 Certification Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. Which document primar...

Unlock Now
$ 1.00