Oregon Commercial General Contractor Level 2 (CGC2) Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which type of contract shifts most of the project risk to the
- Cost-plus
- Time and materials
- Lump sum
- Unit price
contractor?
Rationale: Lump sum contracts require the contractor to complete
the work for a fixed price, placing most risk on the contractor.
- What is the primary purpose of a construction schedule?
- To determine project cost 1 / 4
- To coordinate and sequence project activities
- To select subcontractors
- To prepare permits
Rationale: The construction schedule ensures all activities occur in
the proper order to meet project deadlines efficiently.
- Which of the following is a common method for site soil stabilization?
- Painting
- Compaction
- Welding
- Sandblasting
Rationale: Compaction increases soil density and stability, reducing
settlement and increasing load-bearing capacity.
- In Oregon, who is primarily responsible for ensuring subcontractors
- Owner
- Architect
- General Contractor
- Building Inspector
are licensed?
Rationale: The general contractor must verify that all subcontractors
have proper licensing to legally perform work.
- Which type of insurance protects against third-party property damage
- Workers’ Compensation 2 / 4
or bodily injury?
- Professional Liability
- General Liability
- Builder’s Risk
Rationale: General liability insurance covers claims for property
damage or injury to third parties caused by the contractor’s operations.
- What is the first step in preparing a bid for a project?
- Purchase materials
- Hire subcontractors
- Review project plans and specifications
- Schedule equipment
Rationale: Reviewing plans and specifications is crucial to
understanding project requirements and estimating costs accurately.
- Which of the following is considered a critical path activity in project
- Painting walls
- Installing carpet
- Foundation construction
- Landscaping
management?
Rationale: Critical path activities directly affect the project
completion date; delays in these tasks delay the entire project.
- What is the main function of a performance bond?
- Cover materials cost 3 / 4
- Reduce insurance premiums
- Guarantee contractor completes the project according to contract
- Hire subcontractors
terms
Rationale: A performance bond ensures the contractor fulfills
contractual obligations and protects the owner if the contractor fails.
- Which type of concrete curing method reduces water evaporation?
- Sandblasting
- Wet curing (water spray or ponding)
- Acid washing
- Thermal curing only
Rationale: Wet curing keeps concrete moist, promoting proper
hydration and strength development.
- What is the purpose of a lien waiver?
- Ensure project safety
- Prevent subcontractors or suppliers from placing liens against
- Reduce labor costs
- Verify building permits
property
Rationale: Lien waivers protect the property owner from claims for
unpaid labor or materials.
- Which Oregon code regulates building energy efficiency?
- OSHA Code
- / 4