• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Licensing Exam Practice Test Questions

Class notes Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Louisiana Building Construction Contractor Licensing Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • What is the primary governing body for contractor licensing in
  • Louisiana?

  • National Association of State Contractors
  • Louisiana State Licensing Board for Contractors (LSLBC)
  • Louisiana Construction Authority
  • State Contractor Examination Bureau

Rationale: The LSLBC is the official state entity regulating contractor

licensing in Louisiana.

  • Which document defines the specific responsibilities of parties in a
  • construction contract?

  • Bid Form 1 / 3
  • Project Manual
  • General Conditions
  • Change Order

Rationale: General Conditions outline legal rights, duties, and

responsibilities of the owner, contractor, and architect.

3. The most suitable soil for building foundation support is:

  • Peat
  • Loose sand
  • Gravel
  • Organic topsoil

Rationale: Gravel provides excellent load-bearing capacity and

drainage.

4. A Change Order must be:

  • Oral and witnessed
  • Written and agreed by contracting parties
  • Suggested by owner only
  • Filed with local officials

Rationale: Accepted construction law requires written approvals to

modify contract scope, time, or cost.

  • What does OSHA primarily regulate?
  • Construction project budgets
  • Building design specifications
  • Worker safety and health 2 / 3
  • Insurance rates

Rationale: OSHA’s mission is to ensure safe working conditions.

6. Louisiana Residential Code is primarily based on:

  • Uniform Building Code
  • International Residential Code (IRC)
  • Federal Building Standards Code
  • State-Amended OSHA Guidelines

Rationale: Louisiana adopts IRC with state amendments for one- and

two-family dwellings.

7. A document that lists unit pricing and materials in bids is the:

  • Specifications
  • Contract
  • Schedule of Values
  • Submittal Log

Rationale: Schedule of values itemizes project cost breakdown used

for payment.

  • Which project delivery method includes both design and construction
  • under a single contract?

  • CM Agent
  • Design-Bid
  • Design-Build
  • Fast-Track
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

The step-by-step guides offered by this document made learning easy. A outstanding purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 2, 2026
Description:

Louisiana Building Construction Contractor Licensing Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. What is the primary gover...

Unlock Now
$ 1.00