• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO CCO Crane Exams

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO / CCO Crane Exams BUNDLED TOGETHER (Latest Update) Questions and 100% Correct Verified Answers | Grade A

Question:

Side load may be caused by:

Answer:

Starting or stopping the swing too rapidly

Question:

What is the best procedure to follow when underground utilities may be present?

Answer:

Contact local utility company

  • / 4

Question:

Eccentric main boom tip reeving causes:

Answer:

Twisting of the boom

Question:

How many randomly broken wires in one lay must there be to remove running wire rope from service?

Answer:

6

Question:

When lifting personnel in a man basket using 6x19 wire rope, the minimum

safety factor is:

Answer:

7

Question:

What is the safety factor required when using non rotating wire rope and lifting personnel in a man basket?

Answer:

10 2 / 4

Question:

Who had the responsibility for determining the correct weight of a load?

Answer:

Supervisor

Question:

When working near power lines when is a signal person required?

Answer:

When the load or any part of the crane comes within 20' of live power lines

Question:

When an operator leaves the crane, he must first

Answer:

Put the load on the ground and put all dogs or pawls in.

Ref. OSHA 1926 1417 e

Question:

If replacing the hoist line wire rope on a crane, how do you determine the size of type of wire rope to use?

Answer:

Use manufacturer operators manual or load chart 3 / 4

Question:

After the crane has been checked out and before crane lift operations begin

the crew should:

Answer:

Have a pre-lift meeting OSAH g8

Question:

According to OSHA 1926.1431, at what wind speed must a qualified person determine if it is safe to proceed with the lift of a personnel man basket

Answer:

20 mph

Question:

When is it safe to work closer than the allowable distance from power lines?

Answer:

When utility company says lines are de-energized OSHA

Question:

During set-up how do you determine machine clearances (counterweight, boom, outrigger)

Answer:

Measure for correct distances

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured step-by-step guides that was a perfect resource for my project. Such an excellent resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO / CCO Crane Exams BUNDLED TOGETHER (Latest Update) Questions and 100% Correct Verified Answers | Grade A Question: Side load may be caused by: Answer: Starting or stopping the swing too rapid...

Unlock Now
$ 1.00