• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO CORE Exam Practice Questions with

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

1 NCCCO NCCCO CORE Exam Practice| Questions with Correct Verified Answers| Latest Update (NEW

When arriving in the crane at the job site, the operator should first

determine the condition of the:

  • Crane setup location
  • Access Roads
  • Parking Lot
  • Headache Ball - ANS ✓B) Access Roads
  • What surface listed below would NOT be a good location for assembly or setup of a mobile crane?

  • Above Compacted Fill
  • Above Highway Asphalt
  • Above Underground Vaults
  • Above Highway Concrete - ANS ✓C) Above Underground Vaults
  • Each Outrigger pad and its blocking should be sufficient to support?

  • 85% of the load Chart
  • The total weight of the crane and its load

NCCCO 1 / 4

2 NCCCO

  • The total weight of the crane and its boom
  • 75% of the load chart - ANS ✓B)The total weight of the crane and its
  • load How does high wind affect a mobile crane with a long boom

  • Decrease load line capacity
  • Requires you to slip the swing brake
  • Introduces side load onto the boom
  • Has no effect on overall crane capacity - ANS ✓C) Introduces side load
  • onto the boom When is the only time the outrigger beams should be less than fully extended?

  • The load Chart indicates that this is allowed
  • There is not enough space to extend the beam
  • The crane is working over the front
  • the main boom is fully retracted - ANS ✓A) The load chart indicates that
  • this is allowed What is the primary purpose for a rooster sheave or auxiliary boom point sheave?

NCCCO 2 / 4

3 NCCCO

  • Separate the load hoist lines
  • Separate the boom hoist lines
  • Increase the load Radius
  • Decrease the load radius - ANS ✓A) Separate the load hoist lines
  • Eccentric main boom tip reeving causes which of the following

  • Increased carrier wear
  • increase wire rope wear
  • Twisting of the main boom
  • Twisting of the superstructure - ANS ✓C) Twisting of the main boom
  • Which type of wire rope listed below is installed on most cranes

  • Right Regular Lay
  • Right alternate lay
  • Left regular lay
  • Left alternate Lay - ANS ✓A) Right regular lay

The hoist drum flange shall extend, the floats or pads should always be:

  • 1/2 Inch
  • 1 Inch
  • 1 1/2 Inch

NCCCO 3 / 4

4 NCCCO

  • 2 Inch - ANS ✓A) 1/2 Inch
  • Which of the following is classified as standing wire rope?

  • Main hoist Line
  • Boom Hoist Line
  • Auxiliary Hoist Line
  • Pendant Line - ANS ✓D) Pendant Line

When lifting on outriggers, the floats or pads should always be:

  • Sufficient to support three times the applied load
  • Raise to tough the tires firmly on the ground
  • Secured to the outriggers cylinder
  • Secured to the mats - ANS ✓C) secured to the outriggers cylinders
  • How Many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from service?

  • 4
  • 3
  • 5

D) 6 - ANS ✓D) 6

NCCCO

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its comprehensive coverage, this document was a perfect resource for my project. Definitely a outstanding choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO NCCCO CORE Exam Practice| Questions with Correct Verified Answers| Latest Update (NEW When arriving in the crane at the job site, the operator should first determine the condition of the: A) ...

Unlock Now
$ 1.00