NCCCO CORE EXAM QUESTIONS
AND VERIFIED ANSWERS
Timber Crane Mats Work Best When They Are:
- Bolted Together
- Nailed Together
- Wired Together
D) Left Loose Correct Answer: A) Bolted Together
When Lifting Loads That Are Submerged Under Water With A Mobile Crane, What Is One Of The Conditions That The Operator Should Be Familiar With?
- Current Can Change And Cause The Crane To Tip Over
- Brakes Or Dogs On The Crane Could Get Wet And Slip
- Boom And Extension Can't Be Removed Without High Tide
- Load Will Increase When Lifting The Load Out Of The Water
Correct Answer: D) Load Will Increase When Lifting The Load
Out Of The Water
When Lifting Over Water With A Personnel Platform, What Are The Occupants Of The Platform Required To Wear?
- A Body Harness
- A Waist Belt
- A Floatation Device
D) A Full Face Respirator Correct Answer: C) A Floatation Device
If A Mobile Crane Is Not Set-Up Level And The Operator Swing The Load From The High Side To The Low Side, What Effect Will That Have On The Radius?
- The Radius Will Decrease
- The Radius Stays The Same
- The Radius Can't Be Calculated
D) The Radius Increase Correct Answer: D) The Radius Increase
Increasing The Distance From The Crane's Center Of Gravity To The Tipping Axis Will Have What Effect On A Mobile Crane?
- Increase Stability
- Decrease Stability 1 / 4
- Increase Structural Competence
D) Decrease Structural Competence Correct Answer: B) Decrease
Stability
Backward Stability Of A Mobile Crane Is Tested In Which Configuration Listed Below?
- Basic Boom At Maximum Angle With Maximum Load
- Maximum Boom At Maximum Angle With Maximum Load
- Basic Boom At Minimum Angle With No Load
- Basic Boom At Maximum Angle With No Load Correct
Answer: D) Basic Boom At Maximum Angle With No Load
What Is The Minimum Pitch Diameter Used For Sheaves In A Boom Hoist Reeving System Using Rotation Resistant Wire Rope?
- Not Less Than 15 Times Rope Diameter. Boom Hoist
- Not Less Than 16 Times Rope Diameter. Load Block
- Not Less Than 18 Times Rope Diameter, Load Hoisting- This Is The
One On The Test
D) Not Less Than 20 Times Rope Diameter Correct Answer: A)
Not Less Than 15 Times Rope Diameter. Boom Hoist
When Can Capacity Altering Modifications Be Made To Mobile Cranes?
- Capacity Altering Modifications May Not E Made To Mobile Cranes
- When Lifting In The Tipping Portion Of The Load Chart
- When Lifting In The Structural Portion Of The Load Chart
- When Permission Is Given By The Crane Manufacturer
Correct Answer: D) When Permission Is Given By The Crane
Manufacturer
A Crane Is At The Point Of Instability When The Crane's Leverage On
The Load Equals:
- 100% Of The Load's Leverage On Crane
- 90% Of The Load's Leverage On Crane
- 85% Of The Loads Leverage On Crane
D) 75% Of The Load's Leverage On Crane Correct Answer: A)
100% Of The Load's Leverage On Crane
Who Must Determine Maximum Speed For A Mobile Crane To Travel With A Suspended Load?
- The Competent Person
- The Job Site
- The Superintendent 2 / 4
D) The Craft Foreman Correct Answer: A) The Competent Person
Deflection Of The Boom While Operating A Mobile Crane Will Increase?
- Load Radius
- Weight Of Boom
- Load Weight
D) Crane Stability Correct Answer: A) Load Radius
A Sudden Start Or Stop Of The Hoisting Function While Operating A
Mobile Crane Can Produce A:
- Static Load
- Dynamic Load
- Eccentric Load
D) Symmetrical Load Correct Answer: B) Dynamic Load
When Traveling With A Suspended Load On A Mobile Crane Climbing An Incline, The Load Should Be Carried In Which Direction
- Uphill
- Downhill
- Both Ways
D) Never Correct Answer: A) Uphill
Which Mobile Crane Boom Configurations Can Cause The Most Hazardous Side-Loading Condition For The Crane?
- Short Boom With Minimum Radius
- Long Boom With Minimum Radius
- Short Boom At 45 Degree Angle
D) Long Boom At 45 Degree Angle Correct Answer: B) Long Boom
With Minimum Radius
When Preparing To Hoist A Load, The Load Block Hook Should Be
Positioned:
- Slightly To The Side You're Planning To Swing
- Slightly To The Side Opposite You Plan To Swing
- Directly Above The Load's Center Of Gravity
- Above The Edge Of The Load Closest To The Crane Correct
Answer: C) Directly Above The Load's Center Of Gravity
When Making A Lift On Outriggers, The Maximum Ground-Bearing Pressure Occurs In Which Boom Position?
- Over The Rear
- Over The Corner 3 / 4
- Over The Front
D) Over The Side Correct Answer: B) Over The Corner
When Personal Platforms Are Hoisted With A Mobile Crane What Item Listed Below Must Be Provided?
- A Free Fall Button
- A Load Moment Indicator
- An Anti Two-Block Device
D) An Anti Collision Device Correct Answer: C) An Anti Two-Block
Device Personnel Platforms Suspended On The Hook Of A Mobile Crane, Must Not Exceed What Percentage Of A Crane's Capacity At Any Given Radius?
A) 50%
B) 75%
C) 100%
D) 125% Correct Answer: A) 50%
When Proof Testing A Personnel Platform To 125% Of Its Rated Capacity, How Long Must The Platform Be Suspended?
- 1 Minute
D) 10 Minutes Correct Answer: B) 5 Minutes
Which Of The Following Correctly States The Requirements For Hooks Used To Hoist Employees On A Crane-Supported Personnel Platform?
- Hooks Shall Have A Latch That Closes And Doesn't Lock.
- Hooks Shall Have A Latch That Closes And Locks.
- Hooks Shall Be Able To Support 25 Times Their Normal Rating
- Hooks Shall Be Able To Support 20 Times Their Normal Rating.
Correct Answer:
- Hooks Shall Have A Latch That Closes And Locks.
Osha Permits Hoisting Of Personnel By A Crane As Long As The
Employer Can Show:
- The Prevailing Wind Speed Is Less Than 35 Mph.
- There Is No Less Hazardous Or Practicable Way.
- All Personnel Have Cpr Training And First Aid.
- All Aerial Lifts On Site Are Being Used That Day. Correct
Answer: B) There Is No Less Hazardous Or Practicable Way.
- 7 Minutes
- 5 Minutes
- / 4