- | P a g e
NCCCO Digger Derrick Questions And Answers
What are some places of concern during your walk around - correct -answer- Winch line, hydraulic hose fitting, auger sling, hose fitting by grabbers,
While performing your walk around what is important to check for regarding the dialectic certification - correct -answer-That it is not expired, good for 2 years
How many days ahead should you call before you begin digging, what number do you call - correct -answer-2-3 days
811
What information should you have before you call 811 - correct -answer-Contact information, location of dig, type of work that is to be done
Who comes out to mark locations of underground utilities in your dig area - correct -answer-Utility company 1 / 2
- | P a g e
Always stay away a minimum of what distance from underground utilities when digging - correct -answer-Minimum of 2ft
What can and cannot be used in a tolerance zone To dig - correct -answer-Hand tools, vacuum
No power tools, digger Derrick etc
24 inches each side of conduit
What do you call using the right tools for the right job while partaking in soft excavation or digging by hand - correct -answer-Prudent excavation techniques
What kind of work site protection can be implemented in TTC areas - correct - answer-Flags, cones, signs
What publication can you use to read about temporary traffic control - correct - answer-Manual Uniform Traffic Control Devices
- / 2