• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO EXAM SCRIPT - preferred method of installing wire rope from a...

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO EXAM SCRIPT

ANSWERS TAGGED A+

✔✔the rope runs from the top of the reel to the top of the drum - ✔✔What is the preferred method of installing wire rope from a reel onto a hoist drum?

✔✔Over the rear. - ✔✔Over which quadrant are truck crane capacities usually greater?

✔✔The swing radius of the rear of the rotating superstructure - ✔✔According to OSHA, which accessible area of an operating crane must always be barricaded?

✔✔1926.1400 - ✔✔What is the OSHA regulation governing cranes in construction

✔✔As long as it causes no visible distortion that would interfere with safe operations - ✔✔Under which circumstance is a crack in the windshield of a crane cab okay?

✔✔As long as there is no less hazardous or practicable way - ✔✔Under which circumstance does OSHA permits hoisting of personnel by crane?

✔✔On-rubber chart - ✔✔Unless the manufacturer states otherwise, what crane capacity chart is appropriate when a crane is set up with 3 of its 4 outriggers extended and the fourth is retracted?

✔✔50% - ✔✔According to OSHA, while hoisting personnel, the total load must not exceed what percentage of the crane's rated capacity?"

✔✔Only with freely suspended loads - ✔✔When is side loading of crane booms permitted?

✔✔He/she intends to go ahead - ✔✔What is indicated if an operator makes two audible signals when moving a crane?

✔✔Never - ✔✔When may blocking (cribbing) be placed under outrigger beams?

✔✔Makes the crane more stable - ✔✔What is the result of placing timber blocking under the tips of the tracks on a crawler crane?

✔✔100% - ✔✔According to ASME, what percentage of the manufacturer's crane rating must not be exceeded if a load test is done on a repaired crane?

✔✔It depends if the idler or sprocket are in line or offset from the track rollers - ✔✔Where is the tipping axis of a crawler crane located?

  • / 1

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The detailed explanations offered by this document was a perfect resource for my project. A superb purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO EXAM SCRIPT ANSWERS TAGGED A+ ✔✔the rope runs from the top of the reel to the top of the drum - ✔✔What is the preferred method of installing wire rope from a reel onto a hoist drum? ?...