NCCCO MOBILE CRANE Exam With Latest Questions And Answers. Updated And Verified.
- What action does a signal person intend the operator to perform if he extends his arm at
- Boom down
- Swing
- Boom up
- Extend boom - Answer✔c.
- When hoisting personnel, within what percentage of level must a telescopic boom crane be
- 1%
- 2%
- 5%
- 8% - Answer✔a.
- The load line of the crane you're operating contacts an energized power line. There's no sign
- Climb down carefully from the crane cab
- Jump down, feet together
- Stay in the cab until the lines are de-energized
- Get as far away from the crane as possible - Answer✔c.
- According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-
- 1 broken wire in 6 rope diameters
- 2 broken wires in 30 rope diameters
- 3 broken wires in one strand in one lay 1 / 2
shoulder height, makes a fist with his hand, and sticks his/her thumb up?
in order for the gross ratings in the load chart to remain valid?
of any other danger, such as fire. What should you do?
resistant rope are cause for replacement of the rope?
©BRAINBARTER
- | P a g e
- 2 broken wires in 6 rope diameters - Answer✔d.
- What is the net capacity of a crane on main boom unless the manufacturer states otherwise?
- The capacity listed in the load chart minus the weight of the rigging and all attachments
- The capacity listed in the load chart plus the weight of the rigging and all attachments
- The capacity listed in the load chart minus the weight of the rigging and all attachments not
- The capacity listed in the load chart minus the weight of the rigging alone - Answer✔a.
- What may happen to a properly rigged load when lifted off the ground unless the operator
- It could swing out away from the crane
- It could swing in towards the crane
- It could raise absolutely vertically
- It could shift in its rigging - Answer✔a.
- What Standard Method hand signal is being illustrated?
in use
takes account of boom deflection?
- Swing
- Stop
- Emergency Stop
- Travel - Answer✔a.
- Who should an operator respond to a "stop" signal from?
- Appointed signal person only
- Project manager only
- Superintendent only
- Anyone - Answer✔d.
- Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless
- The side
- The rear
- The front
- / 2
the manufacturer states otherwise?