• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO MOBILE CRANE Tests 100 Correct

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest Version

  • What action does a signal person intend the operator to perform if he extends his arm at shoulder
  • height, makes a fist with his hand, and sticks his/her thumb up?

  • Boom down
  • Swing
  • Boom up
  • Extend boom - ✔✔c.
  • When hoisting personnel, within what percentage of level must a telescopic boom crane be in order
  • for the gross ratings in the load chart to remain valid?

  • 1%
  • 2%
  • 5%
  • 8% - ✔✔a.
  • The load line of the crane you're operating contacts an energized power line. There's no sign of any
  • other danger, such as fire. What should you do?

  • Climb down carefully from the crane cab
  • Jump down, feet together
  • Stay in the cab until the lines are de-energized
  • Get as far away from the crane as possible - ✔✔c.
  • According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope
  • are cause for replacement of the rope?

  • 1 broken wire in 6 rope diameters
  • 2 broken wires in 30 rope diameters
  • 3 broken wires in one strand in one lay
  • 2 broken wires in 6 rope diameters - ✔✔d.
  • / 3
  • What is the net capacity of a crane on main boom unless the manufacturer states otherwise?
  • The capacity listed in the load chart minus the weight of the rigging and all attachments
  • The capacity listed in the load chart plus the weight of the rigging and all attachments
  • The capacity listed in the load chart minus the weight of the rigging and all attachments not in use
  • The capacity listed in the load chart minus the weight of the rigging alone - ✔✔a.
  • What may happen to a properly rigged load when lifted off the ground unless the operator takes
  • account of boom deflection?

  • It could swing out away from the crane
  • It could swing in towards the crane
  • It could raise absolutely vertically
  • It could shift in its rigging - ✔✔a.
  • What Standard Method hand signal is being illustrated?
  • Swing
  • Stop
  • Emergency Stop
  • Travel - ✔✔a.
  • Who should an operator respond to a "stop" signal from?
  • Appointed signal person only
  • Project manager only
  • Superintendent only
  • Anyone - ✔✔d.
  • Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the
  • manufacturer states otherwise?

  • The side
  • The rear
  • The front 2 / 3
  • The outriggers - ✔✔c.
  • What is the definition of "operating radius?"
  • The distance from the base of the boom to the center of the load b. The distance from the front of the
  • crane to the center of gravity of the load

  • The distance from the center of rotation of the crane to the center of the load
  • The distance from the center of rotation of the crane to the center of gravity of the load - ✔✔d.
  • What applies to the capacities below the bold line shown on a load chart?
  • They are based on the structural strength of the crane
  • They must not be used
  • They are based on the stability of the crane
  • They should only be used if the crane is set up on outriggers - ✔✔c.
  • In which quadrant are rough terrain crane capacities generally greater?
  • Over the front
  • Over the rear
  • Over the right side
  • Over the left side - ✔✔a.
  • According to federal requirements, under what conditions is it okay for a person to ride the headache
  • ball?

  • When there is no other way to gain access
  • When the lift has been approved by an engineer
  • When other means would be more dangerous
  • It is never okay - ✔✔d.
  • By what percentage do most manufacturers require a crane's load chart capacity to be reduced by
  • for duty cycle operations such as high-volume concrete placement?

  • 10%.
  • 15%.
  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the step-by-step guides in this document. It was a perfect resource for my project. Truly remarkable!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest Version 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist...

Unlock Now
$ 1.00