Overhead cranes with more than one hoisting unit shall have? -CORRECT->>Its rated load marked on it.
How often does O.S.H.A. require a written wire rope inspection? -CORRECT->>Once a month
What is the purpose of the "E" (Emergency) stop on an overhead crane? -CORRECT->> Removes power to entire crane.
Most loads should be rigged to within how many degrees of level? -CORRECT->>5
According to ASME B30.2, what is the safety factor for rigging? -CORRECT->>5 to 1
According to O.S.H.A. frequent inspections shall be performed? -CORRECT->>Daily to monthly
According to ASME B30.2 a frequent inspection must be performed by a? -CORRECT->> Designated person
According to OSHA, the maximum twist of the hook can't exceed? -CORRECT->>10 degrees
When inspecting electrical contacts, what are the signs they are bad? -CORRECT->> Pitted or burned
According to ASME B30.2, what type of fire extinguisher is required for overhead cranes? - CORRECT->>10BC
Before leaving an overhead crane unattended, attached loads should be? -CORRECT->> Lowered to the floor
Before using your hand to steady any load, you should? -CORRECT->>Follow company policy 1 / 2
According to OSHA, the rated capacity of all overhead cranes shall be? -CORRECT->> Clearly marked on the side of the crane
When attaching spreaders to any load, you must keep in mind that? -CORRECT->>The lower the spreader angle the greater the tension
By order of hitch strength, which is correct?
Vertical, basket, choker Basket, vertical, choker Basket, choker, vertical Choker, basket, vertical -CORRECT->>Basket, vertical, choker
According to OSHA, the maximum hook throat opening must not exceed? -CORRECT->> 15% of its original size
How many cubic feet is in a rectangular object that measures S At. X3 At. X2 ft.? -CORRECT- >>30 cubic feet
An object weighs 150 lbs per cubic foot and measures 4 ft. X3 A. X3 ft., what is its weight? - CORRECT->>5,400 lbs
According to OSHA, how many wraps must be left on the hoist drum of an overhead crane with the hook at its lowest position? -CORRECT->>2 wraps
The upper limit switch of all overhead cranes shall be tested every? -CORRECT->>Shift
Vertical movement of an overhead crane is controlled by the? -CORRECT->>Hoist controller
A swinging load should be controlled by the? -CORRECT->>Bridge and trolley controller
What should be the first step in a daily inspection of an overhead crane? -CORRECT->> Check the main switch
What should be done with an unbalanced load? -CORRECT->>Lower load to floor
When making a lift, where should the load block be positioned? -CORRECT->>Vertically over the load's center of gravity
When energizing the crane, the controller should be in what position? -CORRECT->> Neutral
According do ASME, warning signals shall be given when? -CORRECT->>Starting and during