NCCCO Questions with / Complete / Where is the best location for leveling a crane? - Upperworks When determining the Agross load@ the best method is: - Get an accurate load weight and add the rigging.By order of hitch strength, which is the correct answer? - Basket, vertical, choker
- What is the purpose of using a Jib? - 1. Increase height
- When taking a side strain on a boom, what concerns the operator most? - 1.
- You should always have at least how many wraps on a hoist drum? - 1. 2 ANSI 5-
Boom damage
1.3.1 (1)
- On a load chart, values above the bold line mean: - 1. Capacities based on
- The primary purpose for a rooster sheave or Auxiliary boom point sheave is to: -
- Separate the hoist lines.
- What is the proper procedure when using an insulating link or a boot near power lines? - Correct
- When the number of layers of rope on a drum increases the: - 1. Allowable line
- What is the minimum allowable distance from the crane and powerlines under 50kV? - Correct
- The term AUpperworks or Superstructure@ refer to the area of the crane: - 1.
structural competence.
Answers 1. Be sure to maintain the correct allowable distance from the lines. OSHA
pull decreases
Answers 1. 10 ft. OSHA and ANSI
Above the turntable 1 / 2
- Side loading may be caused by: - 1. Starting or stopping the swing to rapidly.
- What is the best procedure to follow when underground utilities may be present? - Correct
- How many randomly broken wires must there be to remove a running wire rope from service? -
- When lifting personnel in a man basket using 6 X 19 wire rope, the minimum safety factor is? -
- What is the safety factor required when using non-rotating wire rope and lifting personnel in a
- Who has the responsibility for determining the correct weight of a load? - 1.
- When working near powerlines when is a signal person required? - 1. When crane
- When an operator leaves the crane, he must first: - Put the load on the ground
- If replacing the hoist line wire rope on a crane, how do you determine the size or type of wire rope
- After the crane has been checked out and before crane lift operations begin the crew should: -
- According to ANSI B30.5 personnel platform lifts should not be made with wind in excess of: -
- / 2
Answers 1. Contact local utility company Eccentric main boom tip reeving causes - 1. Twisting of the boom (IPT)
6 OSHA and ANSI
7 OSHA and ANSI
man basket? - 1. 10 OSHA
Supervisor
moves within a booms length of powerlines. ANSI 5-3.4.5.2
and put all dogs or pawls in.
to use? - 1. Use Manufacturer=s operators manual or load chart
1. Have a pre-lift meeting OSHA (g)(8)
1. 15 mph ANSI 5-3.2.2(21)