• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Nccco signal person test -

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Nccco signal person test -

continuously - ANSWER during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWER OSHA's standard method crane hand signals would be located in the following designated person - ANSWER according to asme b30.5 prior to qualifying all signal persons they must be tested by?none - ANSWER what should be the response of the operator if the signal is not understood posted conspicuously - ANSWER according to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator - ANSWER when using voice signals according to asme b30.5 who must be present for the pre lift discussion limitations - ANSWER a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested - ANSWER according to osha 1926.1419 before lifting operations begin communication systems shall be identify each other - ANSWER prior to commencing a crane lift the operator and signalperson shall perspective - ANSWER any direction given to the crane operator by the signal person shall be given from the operator function and direction - ANSWER what is the first element of voice signals given to a crane operator prior to the lift three - ANSWER according to osha and asme b30.5 each series of voice signals contain how many elements lift director - ANSWER for lifting operations using voice signals who has the responsibility of permitting multiple simultaneous crane functions 1 / 2

standard signals - ANSWER according to asme b30.5 special signals cannot conflict with

back up - ANSWER if the operator sounds three short audible signals while loving the crane he/she intends to stop - ANSWER if the operator sounds one short audible signal while moving the crane he/she intends to job site location - ANSWER according to asme b30.5 ant audible emergency signal must be agreed upon at each go ahead - ANSWER if the operator sounds two short audible signals while move crane he/she intends to hard wire radio - ANSWER when signaling a tower crane which of the following is most reliable asme b30.3 - ANSWER according to asme which volume listed below must be used to hand signal a tower crane asme b30.5 - ANSWER according to asme which volume listed below must be used to hand signal a mobile crane 10 feet w/encroachment precautions - ANSWER according to osha 1926.1408 the minimum clearance between any part of the crane and power lines rated 50kv or below shall be 10 feet w/encroachment precautions - ANSWER according to osha 1926.1408 for power lines rated 100kv the minimum clearance between the crane and any lines shall be

  • - ANSWER osha 1926.1411 when you encounter power lines with a voltage of 44kv and
  • the crane is in transit you must keep a minimum clearance of how many feet 10 - ANSWER according to osha 1926.1411 when the crane is in transit and the power lines you are to go under are rated at 300kv what minimum clearance must you maintain signal person - ANSWER osha 1926.1401 a dedicated spotter must also have the qualifications of a utility owner/operator - ANSWER overheard power lines shall be considered energized authorization that the lines are deenergized must be given by whom anti two block - ANSWER according to osha 1926.1431 when signaling a crane that is lifting a personnel platform which device listed below must be attached to the crane

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document provided in-depth analysis, which made learning easy. Absolutely outstanding!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

Nccco signal person test - continuously - ANSWER during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER if the communication is disrupted...

Unlock Now
$ 1.00