QUESTION: Hydraulic systems should have their proper fluid level checked ✓✓Correct
Answer: Daily
QUESTION: If power fails during operations, the following shouldn't apply ✓✓Correct
Answer: Do your best to finish moving load where it was designated to go
QUESTION: If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted ✓✓Correct Answer: Person responsible for lift
QUESTION: Where should climbing instructions be kept ✓✓Correct Answer: ON Site
QUESTION: All climbing operations shall be performed under the supervision of ✓✓Correct
Answer: Qualified person
QUESTION: When cranes are erected, load limiting devices shall be tested for proper setting
and operation ✓✓Correct Answer: Before crane is placed in service
QUESTION: Hooks shall be equipped with latches unless the application makes the use of
the latch ✓✓Correct Answer: Impractical
QUESTION: Size and position of signs or panels must satisfy the limitations of ✓✓Correct
Answer: Manufacturer
QUESTION: Fall prevention measures are needed for working at locations where you are exposed ✓✓Correct Answer: To a fall of 6ft or more 1 / 3
- | P a g e
QUESTION: Travel distance on hand levers shall not be greater ✓✓Correct Answer: than 14 inches from neutral position
QUESTION: For power lines rated 175KV the minimum clearance between the lines and any
part of the crane or load is ✓✓Correct Answer: 15ft
QUESTION: All controls shall be tested by the operator at the ✓✓Correct Answer: start of new shift
QUESTION: Before each climbing operation all load members of the support system shall be
✓✓Correct Answer: Inspected
QUESTION: Chain slings are required to be ✓✓Correct Answer: ID tagged
QUESTION: Welding on loads suspended by the crane can only be done if the load has
✓✓Correct Answer: Insulated slings
QUESTION: How much does an average cubic yard of concrete weight ✓✓Correct Answer: 4,000 lbs
QUESTION: Main power switch for tower crane is ✓✓Correct Answer: At base of crane
QUESTION: Items not listed in the frequent inspection checklist are ✓✓Correct Answer: Hydraulic pumps and valves for excessive wear or damage
QUESTION: When is it necessary to determine that there is no practical alternative way to perform the needed work or to gain access to the area ✓✓Correct Answer: Personnel Lift
- / 3
- | P a g e
QUESTION: Each series of voice signals shall contain three elements stated in the following order ✓✓Correct Answer: Function and Direction - Distance and speed - Function stop
QUESTION: When lifting personnel communication shall be maintained between three of the next four ✓✓Correct Answer: Person(s) being lifted - Operator - Signal person
QUESTION: The condition when the tower load block or hook assembly comes in contact
with the upper ✓✓Correct Answer: Two-blocking
QUESTION: Load bearing members of the climbing and support system shall be inspected
before each ✓✓Correct Answer: Climbing operation
QUESTION: Where shall a wind velocity indicating device be mounted ✓✓Correct Answer: At or near the top of crane
QUESTION: A velocity readout shall be provided ✓✓Correct Answer: At the operators station
QUESTION: The area inside the self erecting tower cranes tail swing must be ✓✓Correct
Answer: Barricaded
QUESTION: The self erecting tower crane must be properly grounded according with the
✓✓Correct Answer: National electric code (NEC)
QUESTION: Self Erecting tower crane erection must be performed by ✓✓Correct Answer: Qualified person
QUESTION: Extensive planning must occur before a self erecting tower crane arrives on the job site. The plan should be divided into two major sections as follows ✓✓Correct Answer: Delivery, set up, erection and dismantle - Lifting operations