NCCCO TOWER CRANE CERTIFICATION EXAM WITH
CORRECT ANSWERS GRADED A
When lifting personnel communication shall be maintained between three of the next four Person(s) being lifted - Operator - Signal person
The condition when the tower load block or hook assembly comes in contact with the upper Two-blocking
Load bearing members of the climbing and support system shall be inspected before each Climbing operation
Extensive planning must occur before a self erecting tower crane arrives on the job site. The plan should be divided into two major sections as follows 1 / 3
Page 2 of 30
Delivery, set up, erection and dismantle - Lifting operations
Before each climbing operation all load members of the support system shall be Inspected
Chain slings are required to be ID tagged
Welding on loads suspended by the crane can only be done if the load has Insulated slings
Splices in rall tracks shall have Smooth Joints
Hydraulic systems should have their proper fluid level checked 2 / 3
Page 3 of 30
Daily
If power fails during operations, the following shouldn't apply Do your best to finish moving load where it was designated to go
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted Person responsible for lift
Where should climbing instructions be kept ON Site
All climbing operations shall be performed under the supervision of Qualified person