• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO TOWER CRANE Final Assessment

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | P a g e

NCCCO TOWER CRANE Final Assessment Test Questions and Answers Grade A+ Latest

For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load is - CORRECT ANSWER >>>15ft

All controls shall be tested by the operator at the - CORRECT ANSWER >>>start of new shift

Before each climbing operation all load members of the support system shall be - CORRECT ANSWER >>>Inspected

Chain slings are required to be - CORRECT ANSWER >>>ID tagged

Welding on loads suspended by the crane can only be done if the load has - CORRECT ANSWER >>>Insulated slings

How much does an average cubic yard of concrete weight - CORRECT ANSWER >>>4,000 lbs

Main power switch for tower crane is - CORRECT ANSWER >>>At base of crane

  • / 3
  • | P a g e

Items not listed in the frequent inspection checklist are - CORRECT ANSWER >>>Hydraulic pumps and valves for excessive wear or damage

  • / 3
  • | P a g e

When is it necessary to determine that there is no practical alternative way to perform the needed work or to gain access to the area - CORRECT ANSWER >>>Personnel Lift

Each series of voice signals shall contain three elements stated in the following order - CORRECT ANSWER >>>Function and Direction - Distance and speed - Function stop

When lifting personnel communication shall be maintained between three of the next four - CORRECT ANSWER >>>Person(s) being lifted - Operator - Signal person

The condition when the tower load block or hook assembly comes in contact with the upper - CORRECT ANSWER >>> Two-blocking

Load bearing members of the climbing and support system shall be inspected before each - CORRECT ANSWER >>>Climbing operation

Where shall a wind velocity indicating device be mounted - CORRECT ANSWER >>>At or near the top of crane

A velocity readout shall be provided - CORRECT ANSWER >>>At the operators station

The area inside the self erecting tower cranes tail swing must be - CORRECT ANSWER >>>Barricaded

The self erecting tower crane must be properly grounded according with the - CORRECT ANSWER >>>National electric code (NEC)

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The step-by-step guides offered by this document helped me ace my presentation. A superb purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO TOWER CRANE Final Assessment Test Questions and Answers Grade A+ Latest For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load is - CORRECT ANSW...

Unlock Now
$ 1.00