• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO TOWER CRANE - - Question 1: What should be checked for proper f...

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO TOWER CRANE -

100% CORRECT ANSWERS

Answers to Questions:

Question 1:

What should be checked for proper fluid level in hydraulic systems?

Correct Answer: D - Hydraulic systems

Explanation: Hydraulic systems require proper fluid levels to ensure

efficient operation and to avoid potential damage caused by insufficient lubrication or cooling.

Question 2:

Who is responsible for determining if the load weight does not exceed the crane rating at the designated radius for lifting?Correct Answer: B - Person responsible for lift 1 / 3

Explanation: It is the responsibility of the person in charge of the lift to

ensure the load weight is within the crane's rated capacity for the given radius, ensuring safe lifting operations.

Question 3:

Where should climbing instructions be kept on a site?

Correct Answer: D - In the crane cab

Explanation: Climbing instructions must be readily accessible and are

typically kept in the crane cab for immediate reference during operations.

Question 4:

What is the main power switch location for a tower crane?

Correct Answer: D - Base of crane

Explanation: The main power switch is generally located at the base of

the tower crane to facilitate easy access for power control or in emergencies.

Question 5:

What is the minimum clearance required between power lines rated at 175KV and any part of the crane or load?

Correct Answer: C - 15 feet

Explanation: A minimum clearance of 15 feet is required to prevent

electrical hazards when operating near power lines with a rating of

175KV. 2 / 3

Question 6:

What is the minimum number of voice signal elements in each series when lifting personnel?

Correct Answer: D - 2

Explanation: Clear communication is critical, and a minimum of two

voice signal elements per series ensures clarity and safety during personnel lifting.

Question 7:

What is the condition when the tower load block or hook assembly comes in contact with the upper part of the tower?

Correct Answer: B - Overtravel

Explanation: Overtravel occurs when the load block or hook assembly

makes contact with the upper part of the tower, potentially leading to unsafe conditions.

Question 8:

What is the minimum pitch diameter for load hoisting sheaves according to ASME B30.3?

Correct Answer: C - Less than 18 times rope diameter

Explanation: ASME B30.3 specifies that the pitch diameter of load

hoisting sheaves must be at least 18 times the diameter of the rope to ensure proper functionality and safety.

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its detailed explanations, this document was a perfect resource for my project. Definitely a excellent choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration