All of the following are types of Longitudinal joints except:
- notched butt joint
- butt joint
- notched wegde joint
- wedge joint - ---Answers---A. notched butt joint
Recommended application rates for RS-1 and CRS-1 tack coats
vary, but are typically between:
- 0.01-0.05 liters/m^2
- 0.05-0.10 liters/m^2
- 0.01-0.05 gal/yd^2
- 0.05-0.10 gal/yd^2 - ---Answers---D. 0.05-0.10 gal/yd^2
The most common cause for joints to open up is:
- Excess material at the joint
- Insufficient material at the joint
- Using a butt joint instead of a wedge joint
- Using a wedge joint instead of a butt joint - ---Answers---
- insufficient material at the joint
The primary function of an MTV is to: 1 / 4
- serve as an intermediary between the haul units
- serve as a haul unit for material from the producer
- serve as the preliminary compaction effort
- serve as the finish roller - ---Answers---A. serve as an
intermediary between the haul units
A functional overlay is used when strucural problems are
present in the existing pavement: T or F - ---Answers---False
Haul units need to band the tailgate in front of the paver to
clean out the bed of the truck: T or F - ---Answers---False
HMA should not be loaded into haul units in one large drop: T
or F - ---Answers---True
A leveling course (also known as truing and leveling) may be appropriate when the pavement cross section has deformed
due to failing mixture:T or F - ---Answers---False
Milling typically removes most surface cracks 3-3.5 inches
deep caused by aging and surface stressed: T or F - ---
Answers---False
Cracking and seating, and rubblizing of PCC pavements are
used to eliminate potential reflective cracking in an overlay: T
or F - ---Answers---True
- / 4
The rate at which HMA mixture is delivered to the jobsite should be balanced with the paving crew's ability to place and
compact the mixture within the specified requirements: T or F
- ---Answers---True
If no blue smoke is rising from a load of HMA it is an indication
that the plant is not heating the material sufficiently: T or F - --
-Answers---False
Tarps are required on all haul units: T or F - ---Answers---
True
It is acceptable if HMA to not be uniform if it is smooth and
dense: T or F - ---Answers---False
Using the MTV (Material Transfer Vehicle) helps reduce
segregation by remixing the material from the haul unit: T or F
- ---Answers---True
Best practice is to maintain the level of material in the paver hopper so that the hopper drag slats are visible between
loads: T or F - ---Answers---False
Insufficient material at the longitudinal joint is the most
common cause for joints to open up: T or F - ---Answers---
True
- / 4
Prior to paving the screed should be set to a null position and
the angle of attack should be induced: T or F - ---Answers---
True
When hot material is placed against the first mat, an overlap between 1"-1.5" of fresh mixture onto the cold mat is used to
ensure adequate material for compaction at the edge: T or F -
---Answers---True
If there is excessive material at the joint, the loot operator
should broadcast material across the mat: T or F - ---
Answers---False
The pull of the paver, the head of material, the angle and mass of the screed are the main factors in determining how the
screed reacts to a smooth and uniform riding surface: T or F -
---Answers---True
Longitudinal joint densities are on average between 1-6%
higher than the density of the mat: T or F - ---Answers---
False
Ultimately, it seems the method of the joint constructed is more responsible for quality joints than the experience and
diligence of the paver: T or F - ---Answers---False
Historically, the string-line has been the most accurate means to control longitudinal grade: T or F - ---Answers---True