• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NEWEST NCCCO CORE ACTUAL EXAM

Exam (elaborations) Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NEWEST NCCCO CORE ACTUAL EXAM

QUESTIONS AND VERIFIED ANSWERS

UPDATE ALREADY GRADED A+

If Highwinds are expected and your lattice boom crane must be secured pointing into the wind and the hook secured to a solid structure directly below the boom point

During handling where would you attach slings to lift lattice boom sections Top pin connection fittings on the main cords

On a lattice boom truck crane you measure boom angle From the centerline of the loaded boom and the horizontal

Manufacturer specifications permit only a certain amount of boom to be suspended our past the connection point of the pendant lines during assembly or disassembly of the boom the portion of the boom suspended in this manner is referred to Cantilever length

When I lattice boom is being assembled or shortened it is extremely important to Drive out all pins from outside the boom 1 / 4

A truck crane is operating with his outriggers fully extended and set does not have a fifth front Outrigger the operator should Referred to the manufactures working area diagram

When I lattice boom crane properly set up on outriggers the tipping access is located at Point where the Outrigger pads touch the ground

If the lattice boom truck crane is going to perform work over the front and must have A front mounted Outrigger

How does Highwind affect the operation of a long boom crane Introduces a side load into the boom

What item can be legally removed from a carry deck crane Boom extension

A crane component made by crane company can be used on any other crane made by the company False

  • / 4

A rough terrain crane is commonly referred to as Cherry picker

During crane assembly the counter weight should be installed blank the installation of the complete boom Before

When assembling the boom sections which set of pin holes are fastened first Upper

When installing the bone pens the pin should be pointing Out away from the boom center

When dismantling a crane boom the bottom set of boom pins should be removed first True

It is it safe to climb under a boom to knock out the boom pens if the crane has tension on the pendant lines False

What position should the gantry be when lifting a load Highest 3 / 4

When using the main load line with the gym attached the working load for the boom must be reduced by Manufacturers specifications for jib and hook weight reduction

Jib forestay and backstay pendant lines Of equal length or the backstay pendant lines should be longer

Jib capacity increases as the angle to the ground decreases False

Whenever operating a crane around a newly constructed building which of these conditions could be dangerous Un compacted soil

The ground pressure under outriggers higher than it is under a crawler track because of a smaller bearing surface True

And Outrigger float should be approximately how much larger than Outrigger pad 3x

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured in-depth analysis that was incredibly useful for my research. Such an impressive resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 15, 2025
Description:

NEWEST NCCCO CORE ACTUAL EXAM QUESTIONS AND VERIFIED ANSWERS UPDATE ALREADY GRADED A+ If Highwinds are expected and your lattice boom crane must be secured pointing into the wind and the hook secur...

Unlock Now
$ 1.00