North Carolina Building Contractor Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
Covers all major subject areas: Licensing, Estimating, Plan Reading, Building
Code (NC), OSHA, Safety, Project Management, Contracts, Lien Law, Concrete, Masonry, Roofing, HVAC, Electrical/Plumbing basics, and Business & Finance topics.
1.What is the minimum ceiling height in habitable rooms according to NC Residential Code?
- 6 ft 6 in
- 7 ft
- 7 ft 6 in
- 8 ft 1 / 4
Rationale: NC Residential Code requires 7 ft minimum ceiling height in
habitable rooms.
2.Who issues contractor licenses in North Carolina?
- Secretary of State
- Local County Building Office
- NC Licensing Board for General Contractors
- NC Department of Labor
Rationale: The NCLBGC regulates and administers contractor licensing
statewide.
3.
A general contractor’s license is required in NC for projects costing:
- Over $10,000
- Over $20,000
- $40,000 or more
- $50,000 or more
Rationale: NC law mandates licensing when project value meets or exceeds
$40,000.
4.What is the allowable slope for a ramp used as a building entrance?
A. 1:6
B. 1:8 2 / 4
C. 1:12
D. 1:20
Rationale: ADA and building codes require max 1:12 slope for accessibility.
5.Which document legally binds the owner and contractor?
- Specifications
- Plans
- Contract
- Schedule
Rationale: The signed contract forms the legal agreement of
responsibilities and payment.
6.The minimum compressive strength of concrete for footings in most NC
residential construction:
- 2000 psi
- 2500 psi
- 3000 psi
- 3500 psi
Rationale: Standard footing concrete is 2500 psi minimum unless specified
higher.
7. 3 / 4
What type of bond guarantees the project is completed per contract?
- Bid bond
- Performance bond
- Payment bond
- Fidelity bond
Rationale: Performance bond ensures contractor fulfills contract
obligations.
8.When must OSHA training be provided?
- Only after an accident occurs
- Once a year
- Before employees face hazards
- After 90 days of employment
Rationale: OSHA mandates hazard training before exposure to jobsite
risks.
9.Which schedule method shows task sequencing best?
- Cost report
- Daily log
- Critical Path Method (CPM)
- Bar graph only
Rationale: CPM identifies task dependencies and longest path controlling
completion.
- / 4