Ohio Land Surveyor Exam – Professional Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2025|2026 Q&A | Instant Download Pdf
- A metes and bounds description begins at a designated point and
proceeds by:
- True north bearings
- Angles and distances from the point of beginning
- Section corners only
- Latitude and longitude
Rationale: Metes and bounds descriptions rely on angles and distances
from a defined point of beginning to describe property boundaries.
- Which document establishes the official subdivision plat in Ohio?
- Deed
- Easement 1 / 4
- Plat map recorded in the county recorder’s office
- Survey sketch
Rationale: A subdivision plat is officially established when recorded in the
county recorder’s office, making it legally recognized.
3. When surveying a property, the term “monument” refers to:
- Any tree or rock
- Physical marker denoting a boundary point
- The highest elevation point
- Corner of a building
Rationale: Monuments are physical markers set or found that define
boundary corners or reference points in land surveys.
4. Ohio law requires that all land surveys be referenced to:
- Magnetic north
- True north or an established survey control system
- Township roads
- City limits
Rationale: Surveys must reference true north or an established control
system to maintain consistency with legal descriptions.
5. In the Public Land Survey System, a township is:
- 6 miles by 6 miles
- 1 mile by 1 mile 2 / 4
- 36 miles by 36 miles
- 3 miles by 3 miles
Rationale: Townships in the PLSS are square parcels measuring 6 miles on
each side.
- Which of the following is considered an improvement in boundary
- Trees
- Streams
- Fences and buildings
- Topographic features
surveys?
Rationale: Improvements refer to man-made structures or modifications,
like fences, roads, and buildings, which may influence boundary evidence.
7. The primary purpose of a retracement survey is to:
- Develop a new subdivision
- Determine the location of existing boundary lines
- Measure elevations
- Locate water lines
Rationale: Retracement surveys focus on locating and verifying existing
property boundaries, often for legal purposes.
8. The “point of beginning” in a metes and bounds description is:
- Arbitrary
- A well-defined location where the survey description starts and 3 / 4
ends
- The geographic center of the property
- Always a section corner
Rationale: The point of beginning is the fixed point from which the survey’s
measurements proceed and to which it ultimately returns.
9. When using a total station, the term “EDM” refers to:
- Electronic distance measurement
- Elevation data method
- Electronic distance measurement
- End datum marker
Rationale: EDM is the method by which total stations measure distances
electronically using light or infrared signals.
- In Ohio, which professional can legally perform and certify land
- Engineer
- Architect
- Licensed Professional Surveyor (PLS)
- Realtor
surveys?
Rationale: Only a licensed PLS is legally authorized to perform and certify
land surveys in Ohio.
- Which adjustment method minimizes the sum of the squares of
- / 4
the errors?