• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Practice Exam Questions And Correct

Class notes Jan 1, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Stormwater Inspector Certification Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • The primary purpose of stormwater regulations under the Clean Water

Act is to:

  • Increase groundwater injection
  • Improve drinking water taste
  • Protect water quality in receiving waters
  • Reduce construction labor costs

Rationale: Stormwater rules aim to prevent pollution from degrading

rivers, lakes, and coastal waters.

2. A Stormwater Pollution Prevention Plan (SWPPP) is required for:

  • Any site using pesticides
  • Construction disturbing one acre or more 1 / 3
  • Residential landscaping only
  • Parks and schools only

Rationale: EPA requires SWPPP for construction activities ≥1 acre under

NPDES.

3. The primary pollutant of concern from construction sites is:

  • Oil
  • Trash
  • Sediment
  • Bacteria

Rationale: Exposed soil contributes heavy sediment loads to stormwater.

4. A Notice of Intent (NOI) is filed to:

  • Close a construction project
  • Notify landowners of a sale
  • Obtain NPDES permit coverage
  • Certify contractor training

Rationale: NOI signals coverage under the construction general permit.

5. BMP stands for:

  • Best Mandatory Practice
  • Best Management Practice
  • Basic Monitoring Program
  • Belowground Management Process
  • Rationale: BMPs are methods to prevent stormwater pollution. 2 / 3

  • Which BMP controls sediment at the perimeter of a site?
  • Inlet protection
  • Silt fence
  • Concrete washout
  • Good housekeeping

Rationale: Silt fences prevent sediment from leaving site boundaries.

7. Good housekeeping BMPs focus on:

  • Using more materials
  • Storage and handling of chemicals and wastes
  • Expanding the project area
  • Increasing runoff

Rationale: These BMPs prevent pollutants from spills and site

contamination.

  • Which stormwater phase focuses on preserving existing vegetation?
  • Post-construction
  • Planning/design
  • Construction
  • Monitoring

Rationale: Vegetation preservation must be planned before disturbance.

9. The term “erosion” refers to:

  • Deposition of soil
  • Removal of trash
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

With its practical examples, this document enhanced my understanding. Definitely a outstanding choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 1, 2026
Description:

Stormwater Inspector Certification Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. The primary purpose of stormwater regulations un...

Unlock Now
$ 1.00