• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Practice Exam Questions And Correct

Class notes Jan 1, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

ACI Concrete Flatwork Finisher/Technician Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • Which of the following is the primary purpose of finishing concrete?
  • To increase its compressive strength
  • To produce a smooth, level, and uniform surface
  • To reduce water-cement ratio
  • To speed up curing

Rationale: Finishing is performed to achieve a flat, smooth, and

uniform surface suitable for its intended use.

  • What is the ideal slump range for a typical flatwork slab using a normal
  • concrete mix?

  • 0–1 inch
  • 1–2 inches
  • 3–4 inches 1 / 4
  • 5–6 inches

Rationale: A slump of 3–4 inches provides good workability for

placement and finishing without excessive bleeding.

  • Which tool is typically used for screeding freshly placed concrete?
  • Trowel
  • Straightedge
  • Bull float
  • Edger

Rationale: A straightedge is used to strike off excess concrete and

create a level surface.

  • What is the purpose of using a bull float?
  • Compact concrete
  • Smooth the surface and embed aggregate
  • Measure slab thickness
  • Apply curing compound

Rationale: Bull floating helps to smooth the concrete surface and

bring fine material to the top.

  • Which finishing technique helps reduce the likelihood of surface
  • cracking?

  • Using high water content
  • Delaying finishing operations
  • Proper timing of finishing and control joints
  • Excessive troweling 2 / 4

Rationale: Timely finishing and placement of control joints relieve

shrinkage stress and reduce cracking.

  • What is the typical spacing of contraction joints in a concrete slab?
  • 2–4 feet
  • 5–7 feet
  • 8–12 feet
  • 15–20 feet

Rationale: Contraction joints are typically spaced 8–12 feet apart to

control cracking due to shrinkage.

  • Which of the following is used to create a smooth, hard, and dense
  • surface after floating?

  • Screed
  • Edger
  • Steel trowel
  • Shovel

Rationale: Steel troweling densifies the surface, producing a smooth

and hard finish.

  • When is hand troweling typically performed on a slab?
  • Immediately after placement
  • After initial set and floating
  • Before screeding
  • After curing 3 / 4

Rationale: Hand troweling is done after the concrete has stiffened

enough to support the trowel without leaving marks.

  • What is the primary function of a concrete edger?
  • Screed the concrete
  • Compact the concrete
  • Round the edges of a slab
  • Apply curing compound

Rationale: Edgers create a rounded edge to prevent chipping and

improve durability.

  • What is a common cause of surface scaling on concrete?
  • Low cement content
  • High air content
  • Freezing and thawing of saturated surface
  • Excessive troweling

Rationale: Scaling occurs when water in the surface layer freezes,

causing surface flaking.

  • Which type of concrete finish is typically applied to driveways
  • for slip resistance?

  • Smooth trowel finish
  • Exposed aggregate finish
  • Broom finish
  • Steel trowel finish
  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

I was amazed by the detailed explanations in this document. It was a perfect resource for my project. Truly outstanding!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 1, 2026
Description:

ACI Concrete Flatwork Finisher/Technician Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. Which of the following is the primary pur...

Unlock Now
$ 1.00