- Which phase of DMAIC focuses on defining the project goals and
- Measure
- Analyze
- Define
- Control
customer deliverables?
Rationale: The Define phase establishes the project purpose, scope,
and objectives, and identifies customer requirements.
- Which tool is commonly used in the Measure phase to assess process
capability? 1 / 4
- Cause-and-effect diagram
- FMEA
- Control chart
- Affinity diagram
Rationale: Control charts are used to measure process stability and
capability during the Measure phase.
- In Six Sigma, what is the standard defect rate for a process operating
- 3.4 defects per 1,000 units
- 3.4 defects per million opportunities
- 34 defects per million opportunities
- 0 defects per million opportunities
at “Six Sigma” level?
Rationale: Six Sigma targets 3.4 defects per million opportunities,
representing near-perfect process performance.
- Which type of data represents categories with no intrinsic order?
- Nominal
- Ordinal
- Interval
- Ratio
Rationale: Nominal data are categorical without a natural order,
e.g., types of defects.
- Which statistical test is appropriate for comparing the means of two
independent groups? 2 / 4
- Chi-square test
- t-test
- ANOVA
- Regression
Rationale: A t-test compares the means of two independent samples
to determine if they are significantly different.
- In a SIPOC diagram, what does “C” represent?
- Customers
- Control
- Customers
- Constraints
Rationale: SIPOC stands for Suppliers, Inputs, Process, Outputs,
Customers; “C” represents Customers.
- What is the primary goal of process mapping?
- Increase customer satisfaction
- Understand and visualize process steps
- Reduce defects
- Control variation
Rationale: Process mapping helps identify each step and flow of a
process to find improvement opportunities.
- Which of the following is a key element of Lean methodology?
- Defects per million
- Elimination of waste 3 / 4
- Regression analysis
- Hypothesis testing
Rationale: Lean focuses on removing non-value-added activities,
known as waste, to improve efficiency.
- A project team is performing a root cause analysis. Which tool is most
- Control chart
- Scatter plot
- Fishbone diagram
- Pareto chart
suitable?
Rationale: Fishbone (Ishikawa) diagrams help identify potential
causes of a problem systematically.
- Which measure indicates process capability relative to
- P-value
- Standard deviation
- Cp and Cpk
- Regression coefficient
specification limits?
Rationale: Cp and Cpk measure how well a process can produce
outputs within specification limits.
- Which Six Sigma metric evaluates defects relative to
- Sigma level
- / 4
opportunities for error?