• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Project Management C722, Pre-Assessment

Latest WGU Jan 15, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Project Management C722, Pre-Assessment

  • studiers today Leave the first rating
  • Students also studied Terms in this set (62) Western Governors UniversityC 722 Save

WGU - C722

281 terms LearningChuPreview Practice Test 71 terms Jacqueline_Young6 Preview Project Management C722 185 terms blankenship226 Preview Project 64 terms sce A project was authorized as an operational necessity to repair a design flaw in the date field on a computer system that constrains the year number to two digits instead of permitting the year to be indicated with four digits. During execution of the activity concerned with identifying the affected software, five relevant software modules were discovered that had not been included in the scope baseline. The project team must adjust the baselines to include the omitted scope.Which change management phase does this scenario describe?

a) Preparing for the change

b) Managing the change

c) Reinforcing the change

d) Upgrading the change

a) Preparing for the change

A general contractor is managing a highway construction project that will repair a flood-damaged road. The Department of Transportation offered an incentive fee if the repairs are completed early. Therefore, the project manager has established a rewards and recognition program and has communicated this program to the project team member. The project's recognition program will reward project team members who add value by accelerating the project while maintaining its ability to deliver the completed scope correctly.Which change management phase does this scenario describe?

a) Preparing for the change

b) Managing the change

c) Reinforcing the change

d) Upgrading the change

c) Reinforcing the change

A general contractor is managing a construction project that will add a new conference room to an existing office building. The project was documented in a fixed-price contract that specified a completion date. The contract includes a damages clause imposing a late completion penalty if the conference room is not ready for use by the due date. One month into the implementation, the customer wants to modify the room's lighting equipment.The requested change will delay the project's critical path by three months.Which process should be used to maintain the existing baseline?

a) Using a change management system to influence

performance

b) Absorbing the change request in the baselines for time

and cost

c) Focusing on the original scope

d) Using the risk management system to process change

requests

a) Using a change management system to influence performance

A general contractor from Germany is managing a construction project in Norway that will add a new conference room to an existing office building. The project needs to collect requirements from the client prior to developing plans to build the new conference room.Which two actions would prove useful to plan the project's quality?

a) Defining traceable and verifiable requirements that can

be validated at project closure

b) Establishing metrics that describe what to measure and

how to measure it

c) Using inventory to protect against defects during

project implementation

d) Changing the work plan to account for the project

experiencing common variation

e) Using slogans and numerical quotas to exhort

resources to work harder a & b

a) Defining traceable and verifiable requirements that can be validated at project

closure

b) Establishing metrics that describe what to measure and how to measure it

What is the name for the closing task where all project activities are reviewed to determine what went right and what went wrong?

a) Closeout review

b) Lessons learned review

c) Client deliverables review

d) Project manager review

b) Lessons learned review

What is another name for lessons learned review that is often used by the military and other uniformed services?

a) Rules of engagement

b) Activity report

c) Protocol assessment

d) After action report

d) After action report

The customer of a project validates that scope has been completed for the second of three segments of the project.Which closure practice does this describe?

a) Iteration completion

b) Phase completion

c) Deliverable completion

d) Stage completion

d) Stage completion

The customer of a project validates that the project scope has been completed, all invoices have been paid, and the expected benefits have been realized.Which closure practice does this describe?

a) Iteration completion

b) Phase completion

c) Deliverable completion

d) Stage completion

c) Deliverable completion

What is the purpose of the cost performance index

(CPI)?

a) To measure a project's labor costs

b) To measure a project's cost effectiveness

c) To measure a project's cost efficiency

d) To measure a project's actual costs

c) To measure a project's cost efficiency

What is the purpose of the schedule performance index

(SPI)?

a) To determine a project's budgeted schedule

b) To determine the ratio between planned value and

actual cost

c) To determine a project's time efficiency

d) To determine the ration between cost variance and

schedule variance

c) To determine a project's time efficiency

What is the purpose of cost variance (CV) analysis?

a) To determine if a project is meeting efficiency

expectations

b) To determine if a project is meeting schedule

expectations

c) To determine if a project is meeting budget

expectations

d) To determine if a project is meeting price and time

expectations

c) To determine if a project is meeting budget expectations

Which advantage does the functional (departmentalized) organizational structure provide for a fir with multiple projects?

a) Lines of authority are clear

b) The project customer is the only focus

c) It is efficient for collaboration and cooperation

between departments

d) Each project is managed holistically

a) Lines of authority are clear

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document provided comprehensive coverage, which made learning easy. Absolutely impressive!

Download Document

Buy This Document

$11.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Latest WGU
Added: Jan 15, 2026
Description:

Project Management C722, Pre-Assessment 7 studiers today Leave the first rating Students also studied Terms in this set Western Governors UniversityC 722 Save WGU - C722 281 terms LearningChu Previ...

Unlock Now
$ 11.00