• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Respond to signals from a During the lift, the crane operator shall - ANSWER

Exam (elaborations) Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Respond to signals from a During the lift, the crane operator shall - ANSWER>> designated signal person

Before operating a crane, the floor below gear boxes shall be checked for - Leaking lubricationANSWER>>

Put When loss of power occurs, the operator should immediately - ANSWER>> controllers in off position

To prevent contact on a top running bridge crane, a guard shall be provided Hoisting ropes between the runway conductors and - ANSWER>>

Ensure the path of Immediately before the lift, the operator must - ANSWER>> travel is clear of all non-essential workers

Damage to wire rope Side pulling is most likely to cause - ANSWER>>

Each side of the crane The rated load of the crane shall be marked on - ANSWER>> and legible from the floor Who can authorize lifts in excess of the maximum rated capacity of the crane? - Manufacturer ANSWER>>

  • / 2

According to ASME, what type of inspection shall be conducted on a crane when it Frequent has been idle for 2 months? - ANSWER>>

What should an operator do if the load has a tendency to swing or rotate? - Have a person guide it with a tag lineANSWER>>

Promptly report to the If repairs are necessary the operator shall - ANSWER>> person responsible for the crane

Check After power failure and before reuse, the operator shall first - ANSWER>> operating motions for proper direction

Before For cab operated cranes, a warning signal should be given - ANSWER>> starting lateral movement

When a preventive maintenance program is established, it shall be based on - The crane manufacturer's recommendationsANSWER>>

Breaking A wire rope's maximum safe working load is equal to the - ANSWER>> strength divided by the design safety factor

Each time when approaching the The operator shall test the brakes - ANSWER>> rated load

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured step-by-step guides that enhanced my understanding. Such an remarkable resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 15, 2025
Description:

Respond to signals from a During the lift, the crane operator shall - ANSWER>> designated signal person Before operating a crane, the floor below gear boxes shall be checked for - Leaking lubricati...