SKYWEST ERJ 175 SYSTEMS EXAM (ACTUAL
QUESTIONS WITH 100% VERIFIED
CORRECT ANSWERS
What kind of checklist is the Safety and Power Up?Captain or FO Read And Do checklist
What is the minimum battery voltage for normal ops?
22.5V
When is it appropriate to start the APU in conjunction with the after landing sequence when flying for united or alaska/ When ground power not available at the gate and when nearing the gate
what consideration must be given to shutting down an engine after the 2-min cool down period?Ensure it's not shutdown while turning the aircraft
The after landing sequene for first officer flow is? 1 / 4
Trim 4 flaps @ 0 lights at required APU on
Why would shutting down the right engine during taxi-in possibly cause you to momentarily lose nosewheel steering?System 2 hydraulic pressure could be inoperative
While under tow with both engines shut down, the only braking is from Emergency /parking brake from the system 1 and 2 emergency accumulator
The shutdown flow should be accomplished until APU or external AC power is established
Where can brake temp be monitored after shutdown?status page
- / 4
To prevent electrical power interruptions it is recommended Bring up the electrical strart up page and wait 10 seconds after pushin in the GPU button ensure aPU has stabilized
Which cargo area, are live animals allowed?fwd cargo
Single engine turns are allowed in the event of inop or unavailable ground support equipment and an inop APU True
What sources of external power are available to the ERJ 175?Both AC and DC
What needs to be done to hydraulic system 1 if we are taxing only with Engine 2 on? 3 / 4
Manually turn on hydraulic system 1 with knob. Make sure it's turned back to AUTO when Engine 1 is on.
What hydraulic system is the landing gear on?System 2
What is the main purpose of the Power Transfer Unit (PTU)?Assist the landing gear retraction and extension. Should the right engine or right EDP failure occur.
When will the Power Transfer Unit (PTU) automatically start?Flaps not set to zero or landing gear not up and locked.EDP 1 not failed.Hydraulic reservoir 2 quantity above 12%.
When do we perform the originating checklist?First flight of the day Change in Crew Aircraft swap
- / 4