• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Specialist Certification Exam Practice

ATI EXAM Jan 1, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Ironworkers Wind Tower Erection Specialist Certification Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • Which lift plan component ensures wind turbine components are
  • moved safely according to engineering specifications?

  • Cost report
  • Weather history log
  • Rigging plan
  • Training attendance sheet

Rationale: A rigging plan defines the proper slings, configurations,

and movement path for lifts.

  • What is the maximum wind speed typically allowed for lifting tower
  • sections with a main crane?

  • 20–25 mph (9–11 m/s) 1 / 3
  • 35 mph (15 m/s)
  • 10 mph (4 m/s)
  • 50 mph (22 m/s)

Rationale: Most turbine manufacturers and lift plans prohibit major

lifts above ~20–25 mph due to load sway and control issues.

  • When installing anchor bolts on the foundation, what is critical before
  • setting the base flange?

  • Applying touch-up paint
  • Verifying bolt tension and alignment
  • Removing shims
  • Adding grout beforehand

Rationale: Bolt integrity and correct layout must be verified to ensure

structural base stability.

4. The primary purpose of a tag line during tower section lifting is to:

  • Lift heavier loads
  • Control rotation and orientation
  • Provide crane backup
  • Measure wind

Rationale: Tag lines allow ground control to prevent spinning of

cylindrical components.

  • What device is commonly used to protect slings from sharp tower
  • edges?

  • Jack chain 2 / 3
  • Edge protector / softener
  • Wire rope clip
  • Binder

Rationale: Sling protection prevents cutting and sling failure.

  • Which method is typically used to guide upper tower sections into
  • alignment with lower sections?

  • Glue
  • Draw-in bolts / alignment pins
  • Ratchet straps
  • Hammering flanges

Rationale: Alignment hardware ensures precision fit-up of bolted

flanges.

  • Before climbing, what must be verified regarding personal fall arrest
  • equipment?

  • Uniform color
  • Inspection of harness, lanyard, energy absorber
  • Size of worker’s boots
  • Number of carabiners

Rationale: Equipment inspection prevents failure during a fall event.

8. A torque wrench is used on tower flange bolts primarily to:

  • Remove rust
  • Apply specified tension
  • Change bolt diameter
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

The comprehensive coverage offered by this document enhanced my understanding. A impressive purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: ATI EXAM
Added: Jan 1, 2026
Description:

Ironworkers Wind Tower Erection Specialist Certification Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. Which lift plan component ...

Unlock Now
$ 1.00