Stttudy onldileandhepsiel:pdd d.cm_dx1.J2DuSJdmS3dturbRECT DETAILED ANSWERS WITH (VERIFIED ANSWERS) |ALREADY GRADED A+||NEWEST VERSIONStudy online at https://quizlet.com/_hcexsn1.Splices in rall tracks shall haveSmooth Joints2.-I:le9Q7idpIpynMpdps 9Q:dse8ndysn7ld6l 6nldh97:dQn8bel checkedDaily3.If power fails during operations, the following shouldn't applyDo your best to nish mov-ing load where it was desig-nated to go4.D0dQ e:d7pd9a:nynlM7an:dos d7pdy dHa:d 9yd70dQ e:dweight does not exceed crane rating at radius at which the load is to be liftedPerson responsible for lift5.Where should climbing instructions be keptON Site6.All climbing operations shall be performed under the supervision oflOnrcLa osaRhwe7.When cranes are erected, load limiting devices shall be tested for proper setting and operationBefore crane is placed in service8.Hooks shall be equipped with latches unless the ap-plication makes the use of the latchImpractical9.Size and position of signs or panels must satisfy the limitations ofManufacturer10.Fall prevention measures are needed for working at locations where you are exposedTo a fall of 6ft or more11.Travel distance on hand levers shall not be greaterthan 14 inches from neutral position1 / 17 1 / 3
Stttudy onldileandhepsiel:pdd d.cm_dx1.J2DuSJdmS3dturbRECT DETAILED ANSWERS WITH (VERIFIED ANSWERS) |ALREADY GRADED A+||NEWEST VERSIONStudy online at https://quizlet.com/_hcexsn12.For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load is15ft13.All controls shall be tested by the operator at thestart of new shift14.Before each climbing operation all load members of the support system shall beInspected15.Chain slings are required to beID tagged16.Welding on loads suspended by the crane can only be done if the load hasInsulated slings17.How much does an average cubic yard of concrete weight4,000 lbs18.Main power switch for tower crane isAt base of crane19.Items not listed in the frequent inspection checklist areHydraulic pumps and valves for excessive wear or dam-age20.When is it necessary to determine that there is no practical alternative way to perform the needed work or to gain access to the areaPersonnel Lift21.Each series of voice signals shall contain three ele-ments stated in the following orderFunction and Direction - Dis-tance and speed - Function stop22.2 / 17 2 / 3
Stttudy onldileandhepsiel:pdd d.cm_dx1.J2DuSJdmS3dturbRECT DETAILED ANSWERS WITH (VERIFIED ANSWERS) |ALREADY GRADED A+||NEWEST VERSIONStudy online at https://quizlet.com/_hcexsnWhen lifting personnel communication shall be maintained between three of the next fourPerson(s) being lifted - Op-erator - Signal person23.The condition when the tower load block or hook assembly comes in contact with the upperTwo-blocking24.Load bearing members of the climbing and support system shall be inspected before eachClimbing operation25.Where shall a wind velocity indicating device be mountedAt or near the top of crane26.A velocity readout shall be providedAt the operators station27.The area inside the self erecting tower cranes tail swing must beBarricaded28.The self erecting tower crane must be properly grounded according with theNational electric code (NEC)29.Self Erecting tower crane erection must be per-formed bylOnrcLa osaRhwe30.Extensive planning must occur before a self erecting tower crane arrives on the job site. The plan should be divided into two major sections as followsDelivery, set up, erection and dismantle - Lifting opera-tions31.According to ASME B30.3 the minimum wraps to be left on a hoist drum are332.How much does a cubic foot of steel weigh490lbs33.Engage emergency stop3 / 17
- / 3