NCCCO Mobile Crane Operator (TSS & TLL) Exams | Latest / Update | Verified Questions and 100% Correct Answers | Grade A Certified Prep
Section 1: Introduction
Prepare with confidence using the NCCCO Mobile Crane Operator (TSS & TLL) Exams – Latest / Certified Prep , your all-in-one study solution for mastering the Telescopic Boom Crane Fixed Cab (TSS) and Telescopic Boom Crane Swing Cab (TLL) exams.This expertly compiled guide features 100% verified questions and correct answers, meticulously aligned with the most current NCCCO exam standards for / .Designed by industry professionals, this Grade A Certified Prep resource offers realistic practice questions, detailed explanations, and exam-style formatting to sharpen your test- taking skills and reinforce critical safety knowledge.Whether you're new to crane operations or renewing your certification, this resource is built to help you pass on the first try — confidently, efficiently, and fully prepared.
Section 2: Exam Questions and Answers
Core Exam (Mobile Crane Operator)
- What is the first step before operating a mobile crane on a new job site?
- Extend the outriggers
- Perform a site hazard assessment
- Attach the load to the hook
- Check the hydraulic fluid level
Correct Answer: B. Perform a site hazard assessment
Rationale: OSHA 1926.1402 requires a site hazard assessment to identify risks like power lines, soft ground, or obstructions before crane setup.
- What does the gross capacity on a crane’s load chart include?
- Load weight only
- Load, rigging, and attachments
- Crane’s weight
- Counterweight weight
Correct Answer: B. Load, rigging, and attachments
Rationale: Gross capacity includes the load, hook block, slings, and other
attachments, as specified by the crane’s load chart per ASME B30.5.
- When must the anti-two-block device be inspected?
- During the lift
- Before each shift 1 / 2
- Weekly
- After each lift
Correct Answer: B. Before each shift
Rationale: NCCCO and ASME B30.5 require testing the anti-two-block device
before each shift to prevent boom damage or load drop.
- What is the minimum clearance from a 75 kV power line during crane operations?
- 10 feet
- 15 feet
- 20 feet
- 25 feet
Correct Answer: C. 20 feet
Rationale: OSHA 1926.1408 mandates a 20-foot clearance for power lines between
50–200 kV to prevent electrocution.
- What should an operator do if a hydraulic leak is detected during setup?
- Proceed with light loads
- Stop operations and report the leak
- Increase hydraulic pressure
- Continue the lift slowly
Correct Answer: B. Stop operations and report the leak
Rationale: Hydraulic leaks pose a safety risk, requiring immediate cessation and repair per OSHA 1926.1417.
- What is the purpose of a crane’s level indicator?
- To measure load weight
- To ensure the crane is level
- To monitor boom angle
- To check wind speed
Correct Answer: B. To ensure the crane is level
Rationale: A level indicator confirms the crane is on stable, level ground, critical for safe operation per ASME B30.5.
- What does “two-blocking” mean in crane operations?
- Lifting two loads at once
- Hook block contacting the boom tip
- Using two slings
- Blocking the load’s path
Correct Answer: B. Hook block contacting the boom tip
Rationale: Two-blocking risks cable damage or load drop, prevented by the anti-two- block device per NCCCO standards.
- If a load chart is unavailable, what should the operator do?
- Use a chart from another crane
- Estimate the capacity
- Stop operations until a chart is obtained
- Proceed with small loads
Correct Answer: C. Stop operations until a chart is obtained
Rationale: Operating without a load chart violates OSHA 1926.1417 and NCCCO
requirements for safe lifting.
- What is the primary role of outriggers on a mobile crane?
- To extend the boom
- To stabilize the crane
- To reduce load weight
- To adjust counterweights
- / 2