• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

TLL Exams Latest Update

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO Mobile Crane Operator (TSS & TLL) Exams | Latest / Update | Verified Questions and 100% Correct Answers | Grade A Certified Prep

Section 1: Introduction

Prepare with confidence using the NCCCO Mobile Crane Operator (TSS & TLL) Exams – Latest / Certified Prep , your all-in-one study solution for mastering the Telescopic Boom Crane Fixed Cab (TSS) and Telescopic Boom Crane Swing Cab (TLL) exams.This expertly compiled guide features 100% verified questions and correct answers, meticulously aligned with the most current NCCCO exam standards for / .Designed by industry professionals, this Grade A Certified Prep resource offers realistic practice questions, detailed explanations, and exam-style formatting to sharpen your test- taking skills and reinforce critical safety knowledge.Whether you're new to crane operations or renewing your certification, this resource is built to help you pass on the first try — confidently, efficiently, and fully prepared.

Section 2: Exam Questions and Answers

Core Exam (Mobile Crane Operator)

  • What is the first step before operating a mobile crane on a new job site?
  • Extend the outriggers
  • Perform a site hazard assessment
  • Attach the load to the hook
  • Check the hydraulic fluid level

Correct Answer: B. Perform a site hazard assessment

Rationale: OSHA 1926.1402 requires a site hazard assessment to identify risks like power lines, soft ground, or obstructions before crane setup.

  • What does the gross capacity on a crane’s load chart include?
  • Load weight only
  • Load, rigging, and attachments
  • Crane’s weight
  • Counterweight weight

Correct Answer: B. Load, rigging, and attachments

Rationale: Gross capacity includes the load, hook block, slings, and other

attachments, as specified by the crane’s load chart per ASME B30.5.

  • When must the anti-two-block device be inspected?
  • During the lift
  • Before each shift 1 / 2
  • Weekly
  • After each lift

Correct Answer: B. Before each shift

Rationale: NCCCO and ASME B30.5 require testing the anti-two-block device

before each shift to prevent boom damage or load drop.

  • What is the minimum clearance from a 75 kV power line during crane operations?
  • 10 feet
  • 15 feet
  • 20 feet
  • 25 feet

Correct Answer: C. 20 feet

Rationale: OSHA 1926.1408 mandates a 20-foot clearance for power lines between

50–200 kV to prevent electrocution.

  • What should an operator do if a hydraulic leak is detected during setup?
  • Proceed with light loads
  • Stop operations and report the leak
  • Increase hydraulic pressure
  • Continue the lift slowly

Correct Answer: B. Stop operations and report the leak

Rationale: Hydraulic leaks pose a safety risk, requiring immediate cessation and repair per OSHA 1926.1417.

  • What is the purpose of a crane’s level indicator?
  • To measure load weight
  • To ensure the crane is level
  • To monitor boom angle
  • To check wind speed

Correct Answer: B. To ensure the crane is level

Rationale: A level indicator confirms the crane is on stable, level ground, critical for safe operation per ASME B30.5.

  • What does “two-blocking” mean in crane operations?
  • Lifting two loads at once
  • Hook block contacting the boom tip
  • Using two slings
  • Blocking the load’s path

Correct Answer: B. Hook block contacting the boom tip

Rationale: Two-blocking risks cable damage or load drop, prevented by the anti-two- block device per NCCCO standards.

  • If a load chart is unavailable, what should the operator do?
  • Use a chart from another crane
  • Estimate the capacity
  • Stop operations until a chart is obtained
  • Proceed with small loads

Correct Answer: C. Stop operations until a chart is obtained

Rationale: Operating without a load chart violates OSHA 1926.1417 and NCCCO

requirements for safe lifting.

  • What is the primary role of outriggers on a mobile crane?
  • To extend the boom
  • To stabilize the crane
  • To reduce load weight
  • To adjust counterweights
  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its practical examples, this document was incredibly useful for my research. Definitely a outstanding choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO Mobile Crane Operator (TSS & TLL) Exams | Latest / Update | Verified Questions and 100% Correct Answers | Grade A Certified Prep Section 1: Introduction Prepare with confidence using the NCCC...

Unlock Now
$ 1.00