Main power switch for tower crane is - ANSWER-At base of crane
Items not listed in the frequent inspection checklist are - ANSWER-Hydraulic pumps and valves for excessive wear or damage
When cranes are erected, load limiting devices shall be tested for proper setting and operation - ANSWER-Before crane is placed in service
Hooks shall be equipped with latches unless the application makes the use of the latch - ANSWER-Impractical
Size and position of signs or panels must satisfy the limitations of - ANSWER- Manufacturer
Fall prevention measures are needed for working at locations where you are exposed - ANSWER-To a fall of 6ft or more
Travel distance on hand levers shall not be greater - ANSWER-than 14 inches from neutral position
For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load is - ANSWER-15ft 1 / 4
pg. 2
All controls shall be tested by the operator at the - ANSWER-start of a new shift
The self erecting tower crane must be properly grounded according to the - ANSWER-National electric code (NEC)
Before each climbing operation all load members of the support system shall be - ANSWER-Inspected
Chain slings are required to be - ANSWER-ID tagged
Welding on loads suspended by the crane can only be done if the load has - ANSWER-Insulated slings
Splices in rall tracks shall have - ANSWER-Smooth Joints
Hydraulic systems should have their proper fluid level checked - ANSWER-Daily
If power fails during operations, the following shouldn't apply - ANSWER-Do your best to finish moving load where it was designated to go
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER-Person responsible for lift
Where should climbing instructions be kept - ANSWER-ON Site
- / 4
pg. 3 All climbing operations shall be performed under the supervision of - ANSWER- Qualified person
How much does an average cubic yard of concrete weight - ANSWER-4,000 lbs
When is it necessary to determine that there is no practical alternative way to perform the needed work or to gain access to the area - ANSWER-Personnel Lift
Each series of voice signals shall contain three elements stated in the following order - ANSWER-Function and Direction - Distance and speed - Function stop
When lifting personnel communication shall be maintained between three of the next four - ANSWER-Person(s) being lifted - Operator - Signal person
The condition when the tower load block or hook assembly comes in contact with the upper - ANSWER-Two-blocking
Load bearing members of the climbing and support system shall be inspected before each - ANSWER-Climbing operation
Where shall a wind velocity indicating device be mounted - ANSWER-At or near the top of crane
A velocity readout shall be provided - ANSWER-At the operators station
The area inside the self erecting tower cranes tail swing must be - ANSWER- Barricaded
- / 4
pg. 4 Self Erecting tower crane erection must be performed by - ANSWER-Qualified person
Extensive planning must occur before a self erecting tower crane arrives on the job site. The plan should be divided into two major sections as follows - ANSWER- Delivery, set up, erection and dismantle - Lifting operations
According to ASME B30.3 the minimum wraps to be left on a hoist drum are -
ANSWER-3
How much does a cubic foot of steel weigh - ANSWER-490lbs
When operating a tower crane and there is an uncontrolled movement, the operator should - ANSWER-Engage emergency stop
What will not create a change in stability - ANSWER-Pulling off a fixed load
When performing a load test on a tower crane that travels. How should the job be set - ANSWER-So the maximum weight is on the bogie
When plumbing a tower crane after it has been climbed, the crane must - ANSWER-be balanced
Which of the following OSHA regulations govern suspended personnel platforms - ANSWER-OSHA 1926.550(g)
According to ASME B30.3, the prohibited zone for power lines that are 60kV is - ANSWER-15ft. ASME 3-3.3.4.3(1) Table 1